Baxi Potterton 24/1.0 Clearances, Top 200mm Bottom Left side 5mm Right Side 60mm Front

Page 17

5mm Min

450mm

450mm Min

For Servicing

Purposes

5mm Min

 

 

426mm

 

 

 

 

 

 

 

 

 

 

 

 

In Operation

60mm Min

300mm Min

950mm

200mm Min

10.0Clearances

10.1For your Safety

1.This appliance must have been installed in accordance with the manufacturer’s instructions and the regulations in force.

2.Any modification that may interfere with the normal operation of the appliance without express written permission from the manufacturer or his agent could invalidate the appliance warranty. In GB this could also infringe the Gas Safety (Installation and Use) Regulations.

GB - Heating Industry definition meaning England, Scotland, Wales, Northern Ireland, Isle of Man and the Channel Isles

3.Your boiler must not be operated without the casing correctly fitted.

4.Do not interfere with any sealed components on this boiler.

5.Take note of any warning labels on your boiler.

6.Your boiler should have the following minimum clearances for Safety and Maintenance :-

Top

- 200mm

Bottom

- 200mm

Left side

- 5mm

Right Side

- 60mm

Front

- 5mm (In Operation)

-450mm (For Servicing)

7.If your boiler is installed in a compartment, do not use it for storage purposes. Do not obstruct any purpose provided ventilation openings.

8.Flammable materials must not be stored in close proximity to your boiler.

9.Avoid skin contact when your boiler is in operation, as some surfaces may get hot e.g. pipework.

10.Ensure that the flue terminal, outside the house, does not become damaged or obstructed, particularly by foliage.

11.It is important that the condensate drain system is not blocked, modified or damaged in any way as this would affect the operation of your boiler. Your installer should have insulated any exposed pipework.

© Baxi Heating UK Ltd 2010

17

Image 17
Contents Ecogen 24/1.0 0086 ContentsEasy menu button Default 6am 9am, 11am 12pm & 15pm 22pmQuick Reference Guide Description IntroductionImportant Notes POUGetting Started ProgrammersProgrammable Operator Unit POU POU as a Programmable Room Unit PRUStep Setting the TimeTime Setting Programming the Central Heating Times Setting the Central Heating TimesHighlight ‘Time central heating CH1’ Press the Dial KnobDial to select Display Screen Turn the Dial Knob one clickRequired time. Press Turn the Dial Knob clockwise To highlight ‘Time hot water’ Setting the DHW TimesProgramming the Domestic Hot Water Times Dial Knob. The ‘1st Time OFF’ Time will flash. Turn the Dial Menu Button Easy Menu Dial KnobFurther Information Mode Selection/Temp AdjustmentSelecting the Cental Heating Mode Adjusting the Room temperature set point Selecting the Domestic Hot Water DHW modeAdjusting the DHW Tank Temperature Room Temperature SetpointProgramme Lock Holiday modeContents of Other Functions Selecting Temps / mode hot water Selecting Temps / mode CH1Service/Special operation Selecting Diagnostics engineAutomatic reset Resetting the BoilerUser reset Service reset5mm In Operation ClearancesTop 200mm Bottom Left side 5mm Right Side 60mm Front List of Error Codes Error CodesNRP AR+Engine head control temperature less than 150 degrees C when Fault Indication Protection & PrecautionCall your Installer or Service Engineer as soon as possible Care of the BoilerBenchmark Commissioning Checklist Installation, Commissioning, Service & RepairLegislation Contact the Electricity ProviderPage Page Brooks House, Coventry Road, Warwick. CV34 4LL Serial Number Date of InstallationBaxi