Hearth and Home Technologies SC60 owner manual Finishing Material

Page 38

D. Finishing Material

Refer to Sections 11.A. and Sections 11.B. for combus- tible/noncombustible materials. Refer to Figure 11.9 for noncombustible zone.

WARNING! Risk of Fire! You must maintain clearances.

Use only non-combustible framing material below standoffs.

Sheetrock, wood or other combustibles must NOT be used as sheathing or facing in the noncombustible zone.

DO NOT cover metal fireplace front with combustible materials.

Install combustible materials only to specified clearances on top front and side edges.

WARNING! Risk of Fire!

DO NOT obstruct air inlets or outlets.

DO NOT modify grilles. Modifying or covering grilles could cause temperature rise and fire hazard.

Finishing materials must not interfere with: air flow through grilles or louvers; operation of louvers or doors; access for service.

Complete framing and apply facing material (drywall) over framing.

A bead of 300-deg F minimum non-combustible sealant must be used to close off any gaps at the top and sides between the fireplace and facing to prevent cold air leaks.

Large gaps can be bridged with fiberglass rope gasket.

Only non-combustible materials may be used to cover the metal fireplace front.

 

These surfaces

 

may be covered

 

with non-combustible

 

material.

 

Non-combustible

 

sealant.

Figure 11.9

Noncombustible Facing

Finished combustible wall

 

 

 

 

 

Flat 2 x 4 stud wall

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Combustible material

 

 

 

2 x 4 header, flush with

 

 

 

front of stand-offs

 

 

 

 

 

 

 

 

Non-combustible decorative facing (up to full brick depth)

Continuous,

non-combustible sealantHearth Refractory

Tile, stone or other non-combustible material

HX3 or HX4 Hearth Ext or equivilent insulation

Metal strips are placed 2 in. (51 mm) under the front of the fireplace and must extend beyond the front and sides of fireplace opening by 2 in. (51 mm)

Floor constructed of wood or other combustible material

Figure 11.10 Decorative Facing

38

Heatilator • SC60 • 32838 Rev X • 10/08

Image 38
Contents Fire Risk Wood Burning FireplaceHot screen/mesh and glass doors will cause burns Number Listing Label Information/LocationGrate Safety Alert Key Table of ContentsInstaller Guide User GuideHearth & Home Technologies Limited Warranty CONDITIONS, Exclusions & Limitation of LiabilityHeatilator SC60 32838 Rev X 10/08 Non-Combustible Materials Listing and Code ApprovalsAppliance Certification Combustible MaterialsHot glass will cause burns Operating InstructionsYour Fireplace Grate Seasoned WoodStarting a Fire FirescreenOptional Components Glass DoorsVented Gas Log Sets & Gas Log Lighters Clear SpaceWood Fuel Disposal of Ashes Maintainance and ServiceChimney Inspection/Cleaning Creosote Formation and Need for RemovalInspect Grate Glass CleaningCheck Firebrick Frequency As desiredTroubleshooting Guide Start Fire Problems Possible Cause SolutionGetting Started Typical Fireplace SystemNegative Pressure Design and Installation ConsiderationsDraft Locating Fireplace & Chimney Frequently open doors Central heat outlets or returnsInspect Fireplace and Components Tools and Supplies NeededFireplace System Requirements Framing & Clearances Select Fireplace LocationClearances Clearances to Combustible MaterialsSidewalls/Surrounds Frame the FireplacePosition the Fireplace Installation of FireplaceThings to Consider Place Protective Metal Hearth StripsFt min. from top of uppermost chimney section to air inlet Install Outside Air Kit To service or replace the fan kitChimney Assembly Chimney Requirements Height of Chimney ComponentsUsing Offsets/Returns ExampleAssemble Chimney Sections Install Chimney Air KitInstall Ceiling Firestops Install Attic Insulation Shield Prepare Attic Insulation ShieldFollowing steps should be skipped if using a chase Complete InstallationInstall Flashing Cut out Hole in RoofChimney Termination Requirements Flat RoofsChase Installations Construct the ChaseInstall Fireplace & Chimney Install Chase TopInstall Termination Cap ST375 Square Termination CapTS345/TS345P Square Termination Cap Field Constructed Shrouds ShroudsRadiation Shield Open Top Shroud TR342 caps require radiation shieldMailbox Style Shroud radiation shield required Roofed Style Shroud radiation shield required= 1/k x inches of thickness FinishingHearth Extension Finishing Material HX3 or HX4 Hearth Ext or equivilent insulationCombustible Mantel Firebrick Installation 13 Side Brick InstallationWood Burning Inserts AccessoriesGas Log/Lighter Provision Gas Code, Ansi Z223.1Materials Fireplace1321 mm 406 mm Chimney Components Catalog #14-1/2 10-7/8 276 mm Service PartsContact Information
Related manuals
Manual 48 pages 44.95 Kb