LG Electronics 1400HT operation manual Description

Page 20

REPLACEMENT PARTS – Model 1400HT

PART NO.

 

/ CAT. NO.

DESCRIPTION

 

Door Parts

10500

Door Assembly, Cast Black (handle included)

27M67

Clip Set, Glass

86-128

Door Gasket Kit, 3/4" Rope (includes adhesive)

27M81

Gasket, Glass Channel (self adhesive backed)

10514

Glass, Rectangular 9 1/2 X 17" (glass gasket not included)

10300

Handle Assembly

11530

Hinge, Pin Short - Requires 2

10362

Torque Plate (latch)

 

Draft Module Parts

26M28

Module Assembly, Draft (flame height control)

 

Firebox Parts (see firebrick diagram, page 20) note: all firebrick are 1 ¼” thick

FB-1

Firebrick, 9 x 4 1/2”

FB-2

Firebrick, 9 x 4 1/2” w/notch

10545

Firebrick, 9 x 4 1/2” w/notch (baffle brick are a special denser brick. Do not substitute with FB-2)

FB11

Firebrick, 4 1/2 x 4 3/8”

FB5

Firebrick, 9 x 2 1/2” w/hole

 

Fan System Parts (if optional kit(s) installed)

14440

Dial - A - Temp (rheostat)

 

Misc. Component Parts

775000M

Installation / Operation Manual

For the location of the nearest Dealer for replacement parts, contact:

Lennox Hearth Products

1110 West Taft Avenue Orange, CA 92865

PAGE 20

Image 20
Contents 775000M, Rev. G, 12/03 EPA Certified Wood Burning Stove Retain These InstructionsReference Important Warnings Table of Contents Selecting a Location Planning Your InstallationSmoke Detectors Corner Installation Parallel Alcove Clearance Combustible Wall ClearanceAlcove Clearances Optional Arch TreatmentReduced Masonry Structure Clearance Alcove Floor ProtectionStandard Parallel Hearth PAD Shown Protected Wall ClearanceInstallation Securing the Stove to the FloorManufactured Mobile Homes Only Grounding StoveChimney Inspection Acceptable Connector Pipe for INSTALLA- TionsTypes of Chimneys Chimney Height Requirements 2’ by 10’ Rule for Vent TerminationDraft Test Procedure Draft RequirementsResidential Standard Manufactured Mobile Home Standard Important NotesSolid-Pak chimney section shall be flush with the inside PenetrationProduct Features and Controls Care and OPERATI0NPrimary AIR Control Fuel Door Door OperationUSE Control Settings That Work for YOU HOW to Start and Maintain a FireCare and Operation BREAK-IN PeriodMaintenance FuelReinstall Baffle Brick Cleaning Blower IntakeDoor and Glass Gaskets Servicing GlassTroubleshooting Overfiring Damage Specifications Model 1400HT Description Primary AIR Draft Module Door AssemblyHandle Assembly P/N LB-102214 Stove-Stat Kit Outside Air Floor Duct OAFD-RBlower Kit SAFETY/LISTING Label EPA Label Service and Maintenance LOG Ownership RecordsWest Taft Avenue Orange, CA