LG Electronics 1400HT Chimney Height Requirements, 2’ by 10’ Rule for Vent Termination

Page 9

INSTALLATION

CHIMNEY HEIGHT REQUIREMENTS

The chimney must extend 3 feet (914 mm) above the level of roof penetration and a minimum of 2 feet (610 mm) higher than any roof surface within 10 feet (305 cm) (see below). Check with your local building officials for any ad- ditional requirements for your area.

Due to prevailing winds, local terrain, adjacent tall trees, a hill, or ravine near the home, or adjacent structures, addi- tional chimney height or a special chimney cap may be required to ensure optimum performance.

The 2’ by 10’ Rule for Vent Termination

Requires A Listed

3’ (915mm)

Termination Cap

2’ (610mm)

10’ (305 cm)

The top of the flue must be 2’ (610 mm) higher than any part of the roof within 10’ (305 cm) horizontal and a minimum of 3’ (915 mm) higher than the highest point of roof penetration.

For Manufactured (Mobile) Homes Only: Portions of the chimney and termination that exceed an elevation of 13½ feet above ground level may be designed to be removed for transporting the manufactured (mobile) home.

PAGE 9

Image 9
Contents EPA Certified Wood Burning Stove Retain These Instructions Reference775000M, Rev. G, 12/03 Important Warnings Table of Contents Planning Your Installation Smoke DetectorsSelecting a Location Combustible Wall Clearance Corner Installation Parallel Alcove ClearanceAlcove Clearances Optional Arch TreatmentFloor Protection Reduced Masonry Structure Clearance AlcoveStandard Parallel Hearth PAD Shown Protected Wall ClearanceSecuring the Stove to the Floor InstallationManufactured Mobile Homes Only Grounding StoveAcceptable Connector Pipe for INSTALLA- Tions Types of ChimneysChimney Inspection 2’ by 10’ Rule for Vent Termination Chimney Height RequirementsDraft Requirements Draft Test ProcedureImportant Notes Residential Standard Manufactured Mobile Home StandardPenetration Solid-Pak chimney section shall be flush with the insideCare and OPERATI0N Product Features and ControlsPrimary AIR Control Fuel Door Door OperationHOW to Start and Maintain a Fire USE Control Settings That Work for YOUCare and Operation BREAK-IN PeriodFuel MaintenanceCleaning Blower Intake Reinstall Baffle BrickDoor and Glass Gaskets Servicing GlassTroubleshooting Overfiring Damage Specifications Model 1400HT Description Door Assembly Handle Assembly P/N LB-102214Primary AIR Draft Module Outside Air Floor Duct OAFD-R Blower KitStove-Stat Kit SAFETY/LISTING Label EPA Label Ownership Records Service and Maintenance LOGWest Taft Avenue Orange, CA