State Industries 0710 316888-002 Step E, Step F, Step G Connection to Vent Pipe, Power Vent

Page 30

D.Inspection, cleaning, priming

Visually inspect the inside of the pipe and fitting sockets and remove all dirt, grease or moisture with a clean dry rag. If wiping fails to clean the surfaces, a chemical cleaner must be used. Check for possible damage such as splits or cracks and replace if necessary.

Depth-of-entry

Marking the depth of entry is a way to check if the pipe has reached the bottom of the fitting socket in Step F. Measure the fitting depth and mark this distance on the pipe O.D. You may want to add several inches to the distance and make a second mark as the primer and cement will most likely destroy your first one.

Apply primer to the surface of the pipe and fitting socket with a natural bristle brush. This process softens and prepares the PVC or CPVC for the solvent cementing step. Move quickly and without hesitation to the cementing procedure while the surfaces are still wet with primer.

E.Application of solvent cement

Apply the solvent cement evenly and quickly around the outside of the pipe at a width a little greater than the depth of the fitting socket.

Apply a light coat of cement evenly around the inside of the fitting socket. Avoid puddling.

Apply a second coat of cement to the pipe end.

STEP E

F.Joint assembly

Working quickly, insert the pipe into the fitting socket bottom and give the pipe or fitting a 1/4 turn to evenly distribute the cement. Do not continue to rotate the pipe after it has hit the bottom of the fitting socket. A good joint will have sufficient cement to make a bead all the way around the outside of the fitting hub. The fitting will have a tendency to slide back while the cement is still wet so hold the joint together for about 15 seconds.

STEP F

G. Cleanup and joint movement

Remove all excess cement from around the pipe and fitting with a dry cotton rag. This must be done while the cement is still soft.

The joint should not be disturbed immediately after the cementing procedure, and sufficient time should be allowed for proper curing of the joint. Exact drying time is difficult to predict because it depends on variables such as temperature, humidity and cement integrity. For more specific information, you should contact your solvent cement manufacturer.

STEP G

CONNECTION TO VENT PIPE

The vent system connects to the vent pipe with and elbow or rubber coupling. This coupling includes gear clamps. These connections must be properly seated and tightened to prevent the leakage of flue gases into the installation area.

With 2 in. venting the straight rubber adapter is used for the connection to the vent pipe. With 3 in. venting a transition adapter is required to change from the 2 in. vent pipe to the 3 in. vent size.

Clean and lightly sand the end of the vent piping that will connect to the rubber coupling.

Loosen the upper clamp on the rubber adapter and insert the sanded end of the vent pipe and tighten the gear clamp.

NOTE: Do not glue or seal in the rubber coupling. Check the venting system to ensure that there is no stress on the connection or the vent pipe which will create a twisting or bending.

 

UPPER GEAR

 

CLAMP

 

LOWER

 

GEAR CLAMP

RUBBER COUPLING/

RUBBER ADAPTER (2 in.to

ADAPTER (2”)

3”)

FIGURE 30

U.S. POWER VENT

30

www.statewaterheaters.com

Image 30
Contents Power Vent GAS Models AN Odorant is Added to the GAS Used By this Water HeaterTable of Contents Safe INSTALLATION, USE and Service Important DefinitionsGeneral Safety Can be triggered at any time Preparing for the Installation IntroductionPage Replacement Parts and Deliming Products GET to Know Your Water Heater GAS ModelsOperation Installation Considerations Rough in DimensionsDirectly BELOW. Keep Clear of ALL Obstructions Water Potable Heating All models are considered Water Piping Mixing Valve UsageSuggested Piping Arrangement For TOP Connections Hotter Water can ScaldFacts to Consider about Location Handle Installation Earthquake Zones Page Combustion AIR and Ventilation Appliances in Unconfined SpacesAppliances in Confined Spaces ALL AIR from Outdoors See Figures 12, 13 Closed Water Systems Chemical Vapor CorrosionWater Piping Thermal ExpansionTEMPERATURE-PRESSURE Relief Valve Hard WaterValve and Pipe Insulation if supplied GAS Piping FLOODING/FREEZING High Altitude InstallationsGAS Line Purging Filling the Water HeaterIf using 2 inch vent pipe Vent Pipe TerminationPlanning the Vent System If using 3 inch vent pipe Condensate Installation of Vent SystemVent Terminal INSTALLATION, Sidewall Masonry Side WallsSequence of Installations Installation SequenceVent terminals supplied with heater must be used Installation of Vent SYSTEM, Sidewall Installation of Vertical Vent SystemVent Pipe Preparation Initial PreparationSelection of Materials Recommended BRUSH* Size for Primer Cement Applications Step aStep B Step F Power VentStep E Step G Connection to Vent PipeVent Hoods MAY be Extremely HOT During Operation Electrical Connections Filling the Water HeaterCalibration Operating Instructions Display PanelPage MCU For Your Safety Read Before Lighting Lighting InstructionsHeat Cycle Definitions State Description Temperature Regulation Unique Hybrid Features Temperature ProbesPage Temperature Regulation Constant Output Temperature Control Start UP ConditionsOperational Conditions Venting System Inspection MaintenanceHousekeeping Burner Operation and InspectionCleaning the Inlet Water Filter Anode ROD ReplacementTEMPERATURE-PRESSURE Relief Valve Operation MotorsCleaning the Heat Engine Flushing the Heat Exchanger Lime BUILD- UPFault Indication and Error Codes Draining the TankDiagnostic Display RemarksCode Display Example Format Fault Lockout Code Description Cause Remedy Type Displayed Fault Lockout Code Description Cause Remedy Type Displayed Fault Lockout Code Description Cause Remedy Type Displayed Troubleshooting HOT Water Turns Cold When the TAP is OpenedThere is no HOT Water or Stays ColdService Leakage CheckpointsParts Identification Item # Description AB C DEF Replacement Parts Description NIP/DIP/TBO/HTKIT # Conditions and Exceptions Service and Labor ResponsibilityClaim Procedure Limitation on Implied WarrantiesPage

0710 316888-002, GPH-90N specifications

The State Industries GPH-90N,0710 316888-002 is a high-quality water heater designed to meet the demands of both residential and commercial applications. Renowned for its durability and efficiency, this model serves as an essential component for facilities requiring reliable hot water supply.

One of the standout features of the GPH-90N is its impressive heating capacity, which allows it to deliver hot water quickly and effectively. This model boasts a heating input of 90,000 BTU per hour, making it suitable for large households or commercial establishments. The unit is designed to maintain consistent water temperatures, ensuring that users have access to hot water whenever needed.

The GPH-90N is also equipped with advanced technologies that enhance its operational efficiency. It features a modulating gas burner that adjusts its output to match the flow rate of hot water demanded, thereby optimizing energy use and minimizing operating costs. This technology not only improves performance but also extends the lifespan of the water heater.

Durability is a key characteristic of the State Industries GPH-90N. The unit is crafted from high-quality materials, including a robust stainless steel tank that resists corrosion and ensures long-lasting performance. This corrosion-resistant design is particularly beneficial in areas with hard water, where mineral deposits can be a significant concern. Additionally, the tank is insulated with high-density foam, which helps to maintain heat and reduce standby heat loss.

A crucial aspect of the GPH-90N is its user-friendly features. The control panel is straightforward, allowing users to adjust settings with ease. The water heater is also designed for simple maintenance, ensuring that annual servicing can be carried out with minimal disruption.

Safety is paramount in the design of the GPH-90N. It includes multiple safety features, such as a pressure relief valve and a safety shut-off mechanism, which provide peace of mind for users. This ensures that the unit operates safely under varying conditions.

In conclusion, the State Industries GPH-90N,0710 316888-002 is a powerful and efficient water heater that combines advanced technology with durable construction. Its high heating capacity and user-friendly design make it a reliable choice for both residential and commercial applications, ensuring that hot water is always available when needed.