State Industries GPH-90N, 0710 316888-002 warranty Installation of Vent SYSTEM, Sidewall

Page 27

 

6 in. (15 cm)

 

 

 

 

 

MIN. LENGTH

 

 

 

 

 

 

ATTACH 45°

 

 

 

SEALANT

 

 

 

 

 

 

TERMINATION

 

 

 

 

 

 

ELBOW

 

 

 

 

 

 

 

 

 

 

 

VENT PIPING TO BE

 

 

RODENT

 

 

 

SLOPED (DOWN)

 

 

 

 

 

 

 

 

 

 

TOWARD HEATER

 

 

SCREEN

 

 

 

 

 

 

 

 

TO PREVENT WATER

 

 

(INSTALL

 

 

 

12 in.

INTO

 

 

 

FROM COLLECTING.

SEALANT

(30 cm) min.

ELBOW)

 

 

GROUND

 

 

 

LEVEL*

*WHERE SNOW COVER IS NORMALDURING WINTER, ENSURE SUFFICIENT VENT CLEARANCE TO PREVENT BLOCKAGE OR ICE BUILDUP.

FIGURE 25

INSTALLATION OF VENT SYSTEM, SIDEWALL

With the route of the venting system and selection of materials completed, as discussed in the section of this manual titled “Planning The Vent System”, the through the wall vent terminal in place and the first section of piping, up to first elbow, installed at the rubber coupling, it is time to complete the installation of the venting system for the sidewall installation.

FIGURE 26

 

ATTACH 45°

 

 

BRACKET

 

 

 

TERMINATION

 

 

 

 

 

 

 

 

 

ELBOW

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RODENT

 

 

 

 

 

 

 

 

 

 

 

EQUIVALENT

 

 

SCREEN

 

 

 

VENT LENGTH

 

 

(INSTALL

 

 

 

MEASURED

 

 

INTO

 

 

 

FROM THIS

 

 

ELBOW)

 

 

 

POSITION

 

 

 

 

 

 

 

SEALANT

 

 

 

 

12 in.

 

 

VENT

(30 cm) min.

 

 

 

 

 

 

 

 

RISER

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

GROUND

 

 

VENT

 

 

 

 

 

LEVEL*

 

 

PIPING TO

 

 

 

 

 

 

 

SEALANT

BE SLOPED

 

 

 

 

 

 

 

(DOWN)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TOWARD

* WHERE SNOW COVER IS NORMAL DURING WINTER,

HEATER TO

PREVENT

ENSURE SUFFICIENT VENT CLEARANCE TO PREVENT

WATER FROM

BLOCKAGE OR ICE BUILDUP.

COLLECTING.

FIGURE 27

Before completing the installation of the venting system be sure to read the sections of this manual discussing the proper method of cutting and cementing PVC pipe and fittings in the “Vent Pipe Preparation” section.

It is recommended that the completion of the venting system start at the rubber coupling and run to the coupling on the inside wall of the vent terminal (see Figure 23).

The vent system piping should be supported every 5 ft. (1.5m) of vertical run and every 3 ft. (91cm) of horizontal run. All piping and fittings must be joined by the proper procedures as described under: VENT PIPE PREPARATION.

INSTALLATION OF VERTICAL VENT SYSTEM

A proper flashing or “BOOT” should be used to seal the pipe where it exits the roof. The total vent system should not exceed the equivalent feet of pipe as listed in Table 1.

Provide support for all pipe protruding through the roof. All piping should be properly secured. The vent system piping should be supported every 5 ft. (1.5m) of vertical run and every 3 ft. (91cm) of horizontal run. All piping and fittings must be joined by the proper procedures as described under: VENT PIPE PREPARATION.

www.statewaterheaters.com

27

Image 27
Contents AN Odorant is Added to the GAS Used By this Water Heater Power Vent GAS ModelsTable of Contents Important Definitions Safe INSTALLATION, USE and ServiceGeneral Safety Can be triggered at any time Introduction Preparing for the InstallationPage Replacement Parts and Deliming Products GET to Know Your Water Heater GAS ModelsOperation Rough in Dimensions Installation ConsiderationsDirectly BELOW. Keep Clear of ALL Obstructions Hotter Water can Scald Water Piping Mixing Valve UsageSuggested Piping Arrangement For TOP Connections Water Potable Heating All models are consideredFacts to Consider about Location Handle Installation Earthquake Zones Page Combustion AIR and Ventilation Appliances in Unconfined SpacesAppliances in Confined Spaces ALL AIR from Outdoors See Figures 12, 13 Thermal Expansion Chemical Vapor CorrosionWater Piping Closed Water SystemsHard Water TEMPERATURE-PRESSURE Relief ValveValve and Pipe Insulation if supplied GAS Piping Filling the Water Heater High Altitude InstallationsGAS Line Purging FLOODING/FREEZINGIf using 2 inch vent pipe Vent Pipe TerminationPlanning the Vent System If using 3 inch vent pipe Masonry Side Walls Installation of Vent SystemVent Terminal INSTALLATION, Sidewall CondensateSequence of Installations Installation SequenceVent terminals supplied with heater must be used Installation of Vertical Vent System Installation of Vent SYSTEM, SidewallVent Pipe Preparation Initial PreparationSelection of Materials Recommended BRUSH* Size for Primer Cement Applications Step aStep B Step G Connection to Vent Pipe Power VentStep E Step FVent Hoods MAY be Extremely HOT During Operation Electrical Connections Filling the Water HeaterCalibration Display Panel Operating InstructionsPage MCU Lighting Instructions For Your Safety Read Before LightingHeat Cycle Definitions State Description Temperature Regulation Temperature Probes Unique Hybrid FeaturesPage Temperature Regulation Constant Output Temperature Control Start UP ConditionsOperational Conditions Burner Operation and Inspection MaintenanceHousekeeping Venting System InspectionMotors Anode ROD ReplacementTEMPERATURE-PRESSURE Relief Valve Operation Cleaning the Inlet Water FilterFlushing the Heat Exchanger Lime BUILD- UP Cleaning the Heat EngineDraining the Tank Fault Indication and Error CodesDiagnostic Display RemarksCode Display Example Format Fault Lockout Code Description Cause Remedy Type Displayed Fault Lockout Code Description Cause Remedy Type Displayed Fault Lockout Code Description Cause Remedy Type Displayed Troubleshooting Stays Cold When the TAP is OpenedThere is no HOT Water or HOT Water Turns ColdLeakage Checkpoints ServiceParts Identification Item # Description AB C DEF Replacement Parts Description NIP/DIP/TBO/HTKIT # Limitation on Implied Warranties Service and Labor ResponsibilityClaim Procedure Conditions and ExceptionsPage

0710 316888-002, GPH-90N specifications

The State Industries GPH-90N,0710 316888-002 is a high-quality water heater designed to meet the demands of both residential and commercial applications. Renowned for its durability and efficiency, this model serves as an essential component for facilities requiring reliable hot water supply.

One of the standout features of the GPH-90N is its impressive heating capacity, which allows it to deliver hot water quickly and effectively. This model boasts a heating input of 90,000 BTU per hour, making it suitable for large households or commercial establishments. The unit is designed to maintain consistent water temperatures, ensuring that users have access to hot water whenever needed.

The GPH-90N is also equipped with advanced technologies that enhance its operational efficiency. It features a modulating gas burner that adjusts its output to match the flow rate of hot water demanded, thereby optimizing energy use and minimizing operating costs. This technology not only improves performance but also extends the lifespan of the water heater.

Durability is a key characteristic of the State Industries GPH-90N. The unit is crafted from high-quality materials, including a robust stainless steel tank that resists corrosion and ensures long-lasting performance. This corrosion-resistant design is particularly beneficial in areas with hard water, where mineral deposits can be a significant concern. Additionally, the tank is insulated with high-density foam, which helps to maintain heat and reduce standby heat loss.

A crucial aspect of the GPH-90N is its user-friendly features. The control panel is straightforward, allowing users to adjust settings with ease. The water heater is also designed for simple maintenance, ensuring that annual servicing can be carried out with minimal disruption.

Safety is paramount in the design of the GPH-90N. It includes multiple safety features, such as a pressure relief valve and a safety shut-off mechanism, which provide peace of mind for users. This ensures that the unit operates safely under varying conditions.

In conclusion, the State Industries GPH-90N,0710 316888-002 is a powerful and efficient water heater that combines advanced technology with durable construction. Its high heating capacity and user-friendly design make it a reliable choice for both residential and commercial applications, ensuring that hot water is always available when needed.