TWO TEMPERATURE - TWO HEATERS (ONE PRE-HEATER/ONE BOOSTER HEATER)

WITH OR WITHOUT BUILDING RECIRCULATION

DANGER

* PIPE RELIEF VALVE TO OPEN DRAIN

TEMPERATURE SETTING SHOULD NOT EXCEED SAFE TEMPERATURE AT FIXTURES. SEE WATER TEMPERATURE CONTROL WARNING ON PAGE 5. IF HIGHER PREHEAT TEMPERATURES ARE NECESSARY TO OBTAIN ADEQUATE BOOSTER OUTPUT,ADDANANTI-SCALD VALVE FOR HOT WATER SUPPLIED TO FIXTURES.

**140°F (60°C)TO 150°F (66°C) SHOULD BE MAXIMUM WATER TEMPERATURE MAINTAINED INTHE PRE-HEATERS.

120°F (49°C) SHOULD BE THE MINIMUM TEMPERATURE OF WATER INTHE PRE-HEATERS.

CONNECT CIRCULATING LINE FROM FIXTURES, IF USED, TO COLD WATER SUPPLY LINE OF PRE-HEATER.

CONNECTCIRCULATING LINE OF 180°F (82°C) OR BOOSTED WATER, IF USED, TO INLET WATER LINE TO BOOSTER.

INSTALL IN ACCORDANCE WITH LOCALCODES.

31

Image 31
Contents Rooftop Water Heater Model SRT80 120NE GAS Valve Piping Rooftop SRT80-120NE ROUGH-IN-DIMENSIONSOutback Installation InformationForeword Table of ContentsWater Temperature Control FeaturesDishwashing Machine Requirement Plumbing Manifold AssemblyHigh Limit Switch E.C.O Flow DiagramBlower Plenum AIR System AssemblyHOT Return Recirculation Pump Blower Assembly Drain ValveControl System HOT Surface Igniter LOW GAS Pressure Switch OIM Outdoor Interface ModuleON/OFF Switch WR Ignition Control BoardTank Assembly System Cabinet Assembly Installation InstructionsAdditional Controls Roof Curb Provide Unit SupportRIG and Place Unit AIR Requirements Outdoor StandClearances Hard WaterGAS Piping Pressure SwitchesVenting Vent TerminalsSystem Connections Closed System Water Heater WiringRelief Valve Water Line ConnectionsPage Menu Navigation OperationMenu Tree Fault Conditions Error CodesSequence of Operation Prior to Start UP Filling Operating InstructionsInitial START-UP Cathodic Protection PrecautionsFor Your Safety Read Before Operating General Information MaintenanceVent System Anode Inspection and ReplacementDrain Valve and Access Panels Circulating Pump Installation Diagrams Page Page Pipe Relief Valve to Open Drain Page TROUBLE-SHOOTING Checklist and Service InformationGAS Fails to Shut OFF Replacement PartsBlower Motor will not RUN Motor RUNS, Burner Lights Momentarily Then Locks OUTKeepthiswarrantypostedadjacenttotheheaterforfuturereference Tennessee Waltz Parkway Ashland CITY, TN