State Industries SRT80 120NE warranty Tank Assembly System

Page 10

LOW WATER CUTOFF BOARD AND PROBE

The Low Water Cutoff Board and Probe monitors the water level to confirm the tank is completely full. This function is very important when the unit is first filled with water and when complete loss of power is encountered during freezing temperatures (in case the unit drains while using the anti-freeze kit), see Figure 20.

FIGURE 20

THERMOSTAT/E.C.O. PROBES

The Outback utilizes a two probe system. The upper probe located on top of the unit toward the back of the cabinet consists of a thermostat and E.C.O. The thermostat monitors the top temperature in the tank. The E.C.O. high limit switch interrupts the main burner gas flow should the water temperature reach approximately 205°F. The lower probe measures the water temperature in the lower half of the tank assembly.

FIGURE 21

grounding screw to tie into the metal panel to assure the unit is grounded, see Figure 23.

FIGURE 23

TANK ASSEMBLY SYSTEM

The Tank Assembly is an 80 gallon unit with a U-shaped heat exchanger. It incorporates two inlet tubes to control flow inside the tank. The heat exchanger is equipped with a stainless steel baffle which is non-removable. The working pressure is 150 psi, see Figure 24.

FIGURE 24

TANK INSULATION

The tank assembly is wrapped in foam insulation sealed inside a round jacket. The ends of the tank consist of high temperature fiberglass insulation and foam dams to prevent foam leakage, see Figure 25.

TRANSFORMER

The control system utilizes a 120/24 VAC step down transformer. Most of the control system utilizes 24 VAC for operation. See wiring diagram for those components utilizing 24 VAC and 120 VAC, see Figure 22.

FIGURE 22

JUNCTION BOX

The junction box is where the 120 VAC is supplied to the unit and

 

tied into the rest of the controls. The junction box provides a

FIGURE 25

10

Image 10
Contents Rooftop Water Heater Model SRT80 120NE Rooftop SRT80-120NE ROUGH-IN-DIMENSIONS GAS Valve PipingInstallation Information OutbackTable of Contents ForewordFeatures Water Temperature ControlFlow Diagram Plumbing Manifold AssemblyHigh Limit Switch E.C.O Dishwashing Machine Requirement Drain Valve AIR System Assembly HOT Return Recirculation Pump Blower Assembly Blower PlenumControl System WR Ignition Control Board LOW GAS Pressure Switch OIM Outdoor Interface ModuleON/OFF Switch HOT Surface IgniterTank Assembly System Cabinet Assembly Installation InstructionsAdditional Controls Provide Unit Support Roof CurbRIG and Place Unit Hard Water Outdoor StandClearances AIR RequirementsVent Terminals Pressure SwitchesVenting GAS PipingSystem Connections Water Line Connections Water Heater WiringRelief Valve Closed SystemPage Operation Menu NavigationMenu Tree Fault Conditions Error CodesSequence of Operation Prior to Start UP Filling Operating InstructionsInitial START-UP Precautions Cathodic ProtectionFor Your Safety Read Before Operating Maintenance General InformationCirculating Pump Anode Inspection and ReplacementDrain Valve and Access Panels Vent SystemInstallation Diagrams Page Page Pipe Relief Valve to Open Drain Page Checklist and Service Information TROUBLE-SHOOTINGMotor RUNS, Burner Lights Momentarily Then Locks OUT Replacement PartsBlower Motor will not RUN GAS Fails to Shut OFFKeepthiswarrantypostedadjacenttotheheaterforfuturereference Tennessee Waltz Parkway Ashland CITY, TN