England's Stove Works PELLET STOVES operation manual Unit Preparation

Page 5
UNIT PREPARATION

14.Do not allow paint, chemicals or construction dust on or near your unit. Do not allow liquid or ANY foreign materials on or inside your unit. Shut your unit down and cover it when painting, construction or similar activity is taking place. Wipe and clean your unit after any construction is done in your home, or if any foreign material gets on or inside your unit. You may also need to remove the rear and side cover plates to your unit (unplug unit first) and vacuum and clean the motors and inside of your unit.

15.Improper gasket maintenance, including failure to replace gaskets, can cause air leaks resulting in smoke-backs.

16.Remember that, as with any appliance, there is user responsibility involved, including installation, operation and maintenance of this product. Be sure to check local codes, and call Technical Support at (800) 245-6489 if you have any questions.

17.Be sure to follow the directions of all manufacturers of third party products that you use, including exhaust pipe, etc. Never use gasoline, lantern fuel, charcoal lighter fluid, diesel fuel or any other flammable liquid to start the fire. If you manually start your unit, recommended fire starter materials are: Wax-impregnated wood chips, cardboard cubes or firestarter chips designed for pellet stoves (see section on Manually Starting Unit). Follow any manufacturer’s directions for these products, and NEVER place any firestarter on any hot surface or hot coals. Never apply any firestarter products of any kind to a hot surface or hot coals.

18.Basement Installation: We recommend basement installation be performed only by a professional installer. For basement installations, a 3” (three inch) pipe and coupler must be used for Outside Combustion Air, and a minimum clearance of 3’ (three feet) must be maintained from the ground to the pellet vent exhaust pipe outside the dwelling. Keep in mind that each elbow used reduces draft by 15%; it is good practice to add 3’ (three feet) of vertical rise for each elbow used. Example: After the 2nd elbow used, have 6’ (six feet) of vertical rise before terminating your vent pipe.

UNIT PREPARATION

1.Attach the spring handle to the door by turning it counterclockwise.

Important: Also check hopper latches – must be tight so that the top is sealed to prevent back-burn.

2.Test your 110-volt outlet for current and then plug in the unit. (We highly recommend a surge protector for our pellet unit, as the control panel is electronic).

3.It is important to note that this stove is equipped with a dual auger system. The top auger runs intermittently and drops pellets to the bottom auger; the bottom auger runs constantly and simply pushes the pellets forward to the burn pot. The control board (“Heat Range”) setting determines the top auger feed rate.

4.The stove has a digital read-out control board and is started by pressing the “ON” touch pad. This will start the upper auger, bottom auger and exhaust blower. The room air blower will start later as the stove reaches the pre-set blower temperature (see “Control Board” section for further explanation).

5.Check to be sure both augers and the exhaust blower are operating before connecting the unit to the flue system. Be sure to “dry run” your unit for 20 minutes before connecting it to the flue (it should stop automatically after 20 minutes).

Visit our web site at www.englanderstoves.com for helpful information,

frequently asked questions, parts/accessory orders and more!

5

Image 5
Contents SAFETY NOTICE INSTALLATION & OPERATION MANUALPlease Note the Following Precautionary Statements Save These InstructionsWishing you years of efficient, quality and “comfy” heating A letter from our Technical Support departmentThank you for purchasing this fine product from England’s Stove Works A NOTE ON COLD AIR RETURNS AND CENTRAL FURNACES BEFORE RE-STARTING YOUR UNITIN THE EVENT OF SMOKE-BACK Please call Technical Support at 800 245-6489 with any questionsIMPORTANT INFORMATION UNIT PREPARATION Proper Impingement Baffle Plate Placement in Pellet Stove Firebox FLUE SYSTEM NOTE See the installation drawing later in this manual IllustrationBe sure to check local codes in your area Pellet Vent PipeImportant Notes Concerning Installation Mobile Home InstallationThrough the Ceiling Existing Flue SystemFLOOR AND WALL PROTECTION Freestanding Pellet InstallationFloor Protection Wall ProtectionOPERATING INSTRUCTIONS START- UP PROCEDUREHorizontal Feed System Automatic Start-Upuntil the room air blower begins to operate SHUT-DOWN PROCEDUREE-Codes Unit’s State Before Power Loss Power OutageState When Power Returns Refueling the UnitSemi-Weekly Ash Removal Daily Ash MaintenanceASH REMOVAL AND DISPOSAL Monthly Ash Removal Annual CleaningCAUTION UNPLUG THE UNIT PRIOR TO ANY SERVICE WORK MAINTENANCERear Panel Removal Auger MotorsConvection Blower Vacuum SwitchCombustion Blower GasketsControl Board Call Technical Support at 800CAUTION Moving Parts May Cause Injury Do NOT Operate with Panels Off Disconnect Power Before Servicing UnitDANGER Parts May Be Hot. Risk of Electric Shock Illustration 4 PU-CB04 Control Board Diagram WiringIllustration Hopper Lid Latch Adjusting your Hopper Lid LatchesThermostats ACCESSORY ITEMSAC-103, AC-103BN Lip Trim AC-106-P SH-106-P, AC-106-PBN Window TrimOPTIONS service@englanderstoves.comTechnical Support Department P.O. BoxDimensions of your pellet unit Pellet Stove - Exploded View Diagram28 ½”W x 30”H x 28 ½”D 375 lbsProblem TROUBLE-SHOOTING GUIDESolution CauseFROM THE DATE OF PURCHASE TO THE ORIGINAL OWNER LIMITED 5 YEAR WARRANTYProcedure The manufacturer extends the following warrantiesUNIT INFORMATION WARRANTY REGISTRATION for England’s Stove WorksDEALER INFORMATION