Drolet ECO-35 owner manual Venting through masonry chimney, Venting through side Masonry chimney

Page 10

VERTICALLY INTO EXISTING MASONRY FIREPLACE

NOTE: Follow Vent chimney manufacturer’s instructions.

1.Have the masonry chimney inspected by a qualified chimney sweep or installer to determine its structural condition.

2.You will need a pipe length equal to the chimney height from the hearth plus 18 inches.

3.Install a blanking plate and the chimney pipe, and if used the outside air pipe, as shown in Figure 12.

4.Attach the DuraVent adapter, a section of pipe and clean out tee, making sure the clean out tee is centered in the chimney flue area. Use RTV, metallic tape, and a minimum of three self-taping screws at all joint connections to ensure a tight seal.

5.Position the stove, adhering to the clearances in Figures 1 & 2.

6.Measure and build chimney top plate. Cut out holes for chimney pipe, and if used the outside air pipe. Install and seal with non-hardening mastic to prevent water leakage. Install vent cap.

3"

FOLLOW CHIMNEY OR

VENT MANUFACTURER'S

INSTRUCTIONS

VERTICAL ROOF VENT

18"

TOP PLATE

BLANKING PLATE

OPTIONAL

OUTSIDE AIR

CLEAN OUT

TEE

INSTALLATION THROUGH SIDE OF MASONRY CHIMNEY

Figure 12

Venting through masonry chimney

NOTE: Follow Vent chimney manufacturer’s instructions.

1.Position the stove, adhering to the clearances in Figures 1 & 2. Mark the center of the hole where the pipe is to pierce the masonry chimney.

2.It will be necessary to break out the masonry around the location of the pipe center mark. Use a 4-inch diameter hole for 3-inch pipe and 5-inch diameter hole for 4-inch pipe.

3.Measure and build chimney top plate. Cut out holes for chimney pipe, and if used the outside air pipe.

4.Install the tee on the bottom of the vertical pipe system and lower it down the chimney until the center branch of the tee is level with the center of the hole in the masonry, as shown in Figure 13.

5.Install and seal the top plate from step 3 with non-hardening mastic. Slip the storm collar over the pipe, and while holding the pipe at the proper elevation, affix the collar with a minimum of three ¼” stainless steel sheet metal screws. Seal all joints and seams around the collar.

6.Connect the horizontal pipe by pushing it through the hole in the masonry and lining it up with the branch in the tee. Push the pipe into the tee while twisting it to lock it into the tee.

7.If desired, once the horizontal pipe is in place, the space between the pipe and masonry may be filled with high-temperature grout.

Install the trim collar. An adjustable pipe length and adapter may be needed to finish the connection to the stove.

3"

FOLLOW CHIMNEY OR

VENT MANUFACTURER'S

INSTRUCTIONS

OPTIONAL

OUTSIDE AIR

WALL

THIMBLE

VERTICAL ROOF VENT

18"

TOP PLATE

CLEAN OUT

TEE

Figure 13

Venting through side of

masonry chimney

10

Image 10
Contents Model ECO-35 Freestanding 45266Register YOU Warranty Online IntroductionSafety Precautions Table of Contents Troubleshooting Stove Stops Feeding Pellets and Shows Warning Code dBack wall installation Stove InstallationCorner installation Floor protection Fresh air supply Rear viewVentilated crawl space Venting trough wall Installation ConfigurationsVenting through wall Equivalent Vent Lenght EVLRefer to & 10 for basement installation Vertically Into Existing Chimney SystemVenting through side Masonry chimney Installation Through Side of Masonry ChimneyVenting through masonry chimney Vertically Into Existing Masonry FireplaceProper Fuel Lighting ProcedureOperation PRE-START-UP CheckOpening Door Unit ControlsConvection Blowers Room AIR FAN If the Stove Runs OUT of Pellets Shutdown ProcedureSafety Features Damper ControlDamper operation Damper OperationThermostat terminal Operating the Stove Using a ThermostatThermostat Installation Thermostat locationOperating Safety Precautions Please Read thisCleaning rod Ash drawer MaintenanceBaffle & exhaust access panel ASH RemovalBaffle removal CleaningVaccum USE Chimney Cleaning Exhaust blower cleaningBlowers and Pressure Switch Probe Recommended Maintenance ScheduleRemoval and Replacement of Broken Door Glass TroubleshootingStove Shuts OFF and Shows Warning Code P Stove Shuts OFF and Displays Warning Code E Auger motor has failedStove Feeds PELLETS, but will not Ignite Shows Warning Code Stove Stops Feeding Pellets and ShowsSmoke Smell Coming Back Into the Home Auger Motor Stops Feeding Pellets and Comes Back onStove is Running but Displays Warning Code Smoke Smell or Soot BUILD-UP Message Corresponding WarningComponents left side Electrical DiagramElectrical diagram Components rear Components right sideReplacement Parts Horizontal and Vertical Vent Chart Appendix aIndicate Appliance Code Description of the Problem Appendix BDrolet Limited Lifetime Warranty Description