England's Stove Works 55-TRP22E operation manual Control Board, Recommended Heat Ranges

Page 16

Control Board

The Control Board (Part #PU-CB04) is a digital read-out board. This board offers a wide variety of settings to operate the unit. This part can be removed from the unit by loosening the two outside screws and pulling the board back to the inside of the stove. The rear access panel should be removed prior to removing the control board. A 5-amp “quick-blow” fuse is used on this Control Board.

NOTE: The bottom three control buttons are preset at the factory and should not require any changes. See “Operating Instructions” and “Daily Operation” section of the manual for instructions on other Control Board settings.

 

Recommended Heat Ranges:

 

Low Burn:

Heat Range setting:

1

 

Room Air Blower setting:

1

Medium Low:

Heat Range setting: 2

– 3

Room Air Blower setting: *

Medium High:

Heat Range setting:

5

– 8

Room Air Blower setting: *

High Burn:

Heat Range setting:

9

 

Room Air Blower setting:

9

* NOTE: Blower Speed will automatically be adjusted to the desired Heat Range that you select.

CAUTION:

NOTE: The bottom

3buttons are pre-set at the factory and do not need adjustment.

Call Service at

(800) 245-6489 if you have questions or problems.

Illustration 2a

Control Board

Diagram

Caution

Should you see any evidence of smoke in the hopper (smoke back), immediately close and latch the hopper lid and door to the unit. Open the nearest windows and door to the outside. Then press the OFF button and let the unit cool for at least 3 hours. Do not open the door or hopper lid. This is a maintenance problem that needs to be addressed.

Call Technical Support at (800) 245-6489.

16

Image 16
Contents Model Numbers Be maintainedLetter from our Technical Support department Important Information Unit Preparation Questions, parts/accessory orders and more Pellet Vent Pipe Flue SystemThrough the Wall Mobile Home Installation Through the CeilingExisting Flue System Outside Air Outside Combustion Air IntakeFloor Protection Floor and Wall ProtectionWall Protection Horizontal Feed System Operating InstructionsManually Starting Your Unit SHUT-DOWN Procedure CodesDaily Operation ASH Removal and Disposal Semi-Weekly Ash RemovalAnnual Cleaning Monthly Ash RemovalMaintenance Rear Panel RemovalAuger Motors Auger Bearings and Auger ShaftsVacuum Switch Convection BlowerCombustion Blower GasketsControl Board Recommended Heat RangesIllustration 2b Control Board Diagram Wiring Adjusting your Hopper Lid Latches AC-103, AC-103BN Lip Trim ThermostatsAC-106-P SH-106-P, AC-106-PBN Window Trim Technical Support Department Replacement PARTS, Accessories and OptionsBox Parts Orders only Monroe, VA Questions 800-245-6489 Fax Pellet Stove Exploded View Diagram TROUBLE-SHOOTING Guide Problem Cause SolutionWarranty is not Transferable Page Warranty Registration for England’s Stove Works
Related manuals
Manual 24 pages 43.38 Kb