Enviro C-10450 owner manual KIT Components

Page 15

Initial Installation

QUALIFIED INSTALLERS ONLY

CATHEDRAL CEILING INSTALLATION:

STEP 1. Follow installation steps 1 & 2 under ‘Vertical Installation’.

STEP 2. Using the plumb bob, mark the centerline of the venting system on the ceiling and drill a small hole through the ceiling and roof at this point. From the roof, locate the drill hole and mark the outline of the “Cathedral Ceiling Support Box”.

STEP 3. Remove shingles or other roof coverings as necessary to cut the rectangular hole for the “Support Box”. Cut the hole 1⁄8” larger than the “Support Box” outline.

STEP 4. Lower the “Support Box” through the hole in the roof until the bottom of the “Support Box” protrudes at least 2 inches (5 cm) below the ceiling. Align the “Support Box” both vertically and horizontally with a level as shown in Figure 19. Temporarily tack the “Support Box” in the place through the inside walls and into the roof sheathing.

STEP 5. Using tin snips, cut the “Support Box” from the top corners down to the roof line, and fold the resulting flaps over the roof sheathing (Figure 20). Before nailing it in to the roof, run a bead of non-hardening mastic around the top edges of the “Support Box”, to make a seal between the box and the roof. Clean out any combustible material from the inside of the “Support Box”.

STEP 6. Complete the cathedral ceiling installation by following the same procedures outlined in Steps 4 through 9 for “Vertical Installation”.

Figure 19: Cathedral Ceiling Support Box

Leveling.

Figure 20: Cathedral Ceiling Support Box

Installation.

FREESTANDING DIRECT VENT KIT WITH COUPLER:

KIT COMPONENTS:

Quantity

Description

Quantity

Description

 

 

 

 

1

Horizontal direct vent termination cap

1

Ø65⁄8” (17 cm) 90° elbow

 

 

 

 

2

Flue collar adapters (only one used)

4

Wire spacers

 

 

 

 

4

T-20 Torx screws

3

Decorative rings

 

 

 

 

1

Wall thimble

1

4 oz tube RTV silicone

 

 

 

 

1

Inside finish trim collar

20

9/16” tech screws

1

5’ (190 cm) length of Ø4” (10 cm) double walled flex pipe

8

11⁄2” wood screws

 

 

 

 

2

24” (61 cm) section of Ø65⁄8” (17 cm) straight pipe

1

Vinyl siding deflector

 

 

 

 

Please ensure that all components are supplied with this kit. If components are missing or have been damaged, contact your dealer, distributor, or courier company. Do not attempt the installation if components are missing or damaged.

15

Image 15
Contents S H E R W O O D I N D U S T R I E S L T D EG28 DVSafety Precautions For Your SafetyGeneral Table of Contents Codes And Approvals Vented GAS Fireplace Heater EG28 DV NG/LPGThis Enviro EG28 DV Fireplace EG28 Exterior Dimensions SpecificationsQualified Installers only Initial InstallationVent restrictor ring Vent Pipe Types with Part Numbers Venting Terminals Cannot be Recessed Into a Wall or SidingCommon Vertical Installation High temperature Silicone Male Edge Outer pipe. Push Installing Horizontal Vent Termination Do not interfere with the structural integrity of the walls Feet Meters Roof Pitch Minimum HeightMulti-Story Vent Pipe Installation KIT Components Installation Instructions Wall thimble Assembly of Venting into a Class ‘A’ Chimney EG28 DV Wiring Diagram Then examine the flames, compare the flames to Figure 50% turn down HI-LOW Regulator To Test Valve Pressures GAS Line ConnectionLog Placement Secondary InstallationLog Placement with Embers Water Never USE AN Open Flame for Leak TESTING. If Operating InstructionsWhat to do if YOU Smell GAS Opening the Door Routine Maintenance and ServiceCleaning the Inside of the Firebox Cleaning Plated SurfacesProblem Possible Cause Solution Trouble ShootingReference Number Part Description Part Number Parts ListParts List Parts Diagram Chassis EG 28 Gas Tray and Door Assemblies To the Distributor WarrantyInstallation Data Sheet