Enviro C-10450 owner manual Common Vertical Installation

Page 9

Initial Installation

QUALIFIED INSTALLERS ONLY

PLANNING YOUR INSTALLATION:

When planning your installation, it will be necessary to select the proper length of vent pipe for your particular requirements. It is important to note when passing through a wall, the maximum allowable wall thickness is 10 inches (25.4 cm), 11⁄2 inches (3.8 cm) clearance to combustibles must be maintained. Select the amount of vertical rise desired for “vertical-to-horizontal” type installations. To determine the length of vent pipe required for vertical installations, measure the distance from the appliance flue outlet to the ceiling, the ceiling thickness, the vertical rise through the attic or second story, and allow for sufficient vent height above the roof line. For two story applications, a fire stop is required at each floor level. If an offset is needed in the attic, additional pipe and elbows will be required. To connect the venting system to the appliance flue outlet, a twist-lock adapter is built into the appliance at the factory. Refer to ‘Vent Configuration and Restrictor Settings’ for venting parameters.

Your total vent pipe length must be within the shaded area of Figure 4. If a 90° elbow is used in the horizontal plane, 36” (91.4 cm) must be subtracted from the allowable horizontal run.

There are three (3) basic types of Direct Vent System installations. The two (2) types of installations are:

Round Support

Box/Wall Thimble

Horizontal

Termination

Pipelength

90° Elbow

Pipelength

Figure 6: Common Horizontal Installation.

Vertical

Termination

Storm Collar

Flashing

Ceiling Firestop

Round Support

Box/Wall Thimble

Cathedral Ceiling

Support Box

Pipelength

Pipelength

Figure 7: Common Vertical Installation.

9

Image 9
Contents S H E R W O O D I N D U S T R I E S L T D EG28 DVSafety Precautions For Your SafetyGeneral Table of Contents Codes And Approvals Vented GAS Fireplace Heater EG28 DV NG/LPGThis Enviro EG28 DV Fireplace EG28 Exterior Dimensions SpecificationsQualified Installers only Initial InstallationVent restrictor ring Vent Pipe Types with Part Numbers Venting Terminals Cannot be Recessed Into a Wall or SidingCommon Vertical Installation High temperature Silicone Male Edge Outer pipe. Push Installing Horizontal Vent Termination Do not interfere with the structural integrity of the walls Feet Meters Roof Pitch Minimum HeightMulti-Story Vent Pipe Installation KIT Components Installation Instructions Wall thimble Assembly of Venting into a Class ‘A’ Chimney EG28 DV Wiring Diagram Then examine the flames, compare the flames to Figure 50% turn down HI-LOW Regulator To Test Valve Pressures GAS Line ConnectionLog Placement Secondary InstallationLog Placement with Embers Water Never USE AN Open Flame for Leak TESTING. If Operating InstructionsWhat to do if YOU Smell GAS Cleaning the Inside of the Firebox Routine Maintenance and ServiceCleaning Plated Surfaces Opening the DoorProblem Possible Cause Solution Trouble ShootingReference Number Part Description Part Number Parts ListParts List Parts Diagram Chassis EG 28 Gas Tray and Door Assemblies To the Distributor WarrantyInstallation Data Sheet