Enviro C-10450 owner manual 50% turn down HI-LOW Regulator

Page 21

Initial Installation

FUEL CONVERSION:

WARNING: This conversion kit shall be installed by a qualified service technician in accordance with the manufacturer’s instructions and all applicable codes and requirements of the authority having jurisdiction. If the information in these instructions is not followed exactly, a fire, explosion or CO poisoning may result. The qualified service agency is responsible for the proper installation of this kit. The installation is not proper or complete until the operation of the converted appliance is checked as specified in the owner’s conversion kit.

Please read and follow these instructions. Also please read the instruction guidelines provided by S.I.T on how to remove and install the HI-LOW regulator.

STEP 1. Carefully inspect all parts supplied with this conversion kit. STEP 2. Shut the gas off and disconnect the main gas line from the unit.

STEP 3. Open the door by unscrewing the 1⁄2” bolt on the right hand side of the stove. Lift door off the hinges mounted on the left-hand side.

STEP 4. Carefully remove the log set and ember material if they are installed.

STEP 5. Remove the two (2) T-20 screws on the burner tray located between the front and rear burners. STEP 6. Change the regulator on the top of the gas valve. (Follow the instructions provided by S.I.T)

STEP 7. To change the pilot, pull the pilot hood straight up to access the pilot injector, using a 5/32” Allen key, remove the pilot injector.

STEP 8. Install new pilot injector supplied with the conversion kit. Screw the new injector inside the pilot assembly and re-install the hood by placing the hood on the assembly, line up the keyway and snap into place

STEP 9. Remove the two (2) main burner orifices using a 1⁄2” deep socket.

STEP 10. Install the two (2) new orifices supplied making sure that the orifices are in the correct location. Be sure to put a bead of pipe thread sealant or approved Teflon tape on the orifices before installing them into the burner assembly.

STEP 11. Re-install burner tray, log set and door. Also refer to “Installing Log Set and Embers.”

STEP 12. Reconnect the gas line to the unit. Do a leak check using soap and water solution or an approved method on the gas supply and the pilot tubing.

STEP 13. Re-light the appliance to ensure proper operation and proper flame appearance. Be sure to adjust the venturi setting to achieve an efficient flame in the fireplace.

STEP 14. MAKE SURE that the sticker provided by S.I.T is installed to signify that this valve has been converted to a different type of fuel. Also make sure that the rating plate has a conversion label to show that this unit has been converted to a different fuel type.

A VISUAL CHECK OF THE REGULATOR KNOB IS NECESSARY TO DETERMINE WHETHER OR NOT THE REGULATOR IS THE CORRECT PART. A 50% TURN DOWN REGULATOR WILL HAVE ONLY ONE CORNER ON THE KNOB.

1

- 50% turn down HI-LOW Regulator

Table 5: Orifice Information.

 

3

- T-20 Torx screws

 

 

 

 

 

1

- T-20 tamper proof Torx screwdriver bit

 

Natural Gas

 

Propane

1

- pilot injector

Pilot Orifice

.62 mm

 

.35 mm

2

- Main orifice

 

 

 

 

Burner Orifice

#43 DMS

 

#53 DMS

Labels to show conversion.

 

 

 

 

 

Venturi Setting

1/16” min.

 

1⁄4” Min

 

 

 

21

Image 21
Contents S H E R W O O D I N D U S T R I E S L T D EG28 DVSafety Precautions For Your SafetyGeneral Table of Contents Codes And Approvals Vented GAS Fireplace Heater EG28 DV NG/LPGThis Enviro EG28 DV Fireplace EG28 Exterior Dimensions SpecificationsQualified Installers only Initial InstallationVent restrictor ring Vent Pipe Types with Part Numbers Venting Terminals Cannot be Recessed Into a Wall or SidingCommon Vertical Installation High temperature Silicone Male Edge Outer pipe. Push Installing Horizontal Vent Termination Do not interfere with the structural integrity of the walls Feet Meters Roof Pitch Minimum HeightMulti-Story Vent Pipe Installation KIT Components Installation Instructions Wall thimble Assembly of Venting into a Class ‘A’ Chimney EG28 DV Wiring Diagram Then examine the flames, compare the flames to Figure 50% turn down HI-LOW Regulator To Test Valve Pressures GAS Line ConnectionLog Placement Secondary InstallationLog Placement with Embers Water Never USE AN Open Flame for Leak TESTING. If Operating InstructionsWhat to do if YOU Smell GAS Cleaning the Inside of the Firebox Routine Maintenance and ServiceCleaning Plated Surfaces Opening the DoorProblem Possible Cause Solution Trouble ShootingReference Number Part Description Part Number Parts ListParts List Parts Diagram Chassis EG 28 Gas Tray and Door Assemblies To the Distributor WarrantyInstallation Data Sheet