TYPICAL THROUGH WALL WITH EXTERIOR BLOWER KIT INSTALLATION - VERTICAL TERMINATION:

Follow the previous pages for through wall installations. Ensure that vent pipe is properly secured to wall using wall straps. Maintain clearances to combustibles on vent pipe as well as unit.

Roof Sheathing

Rain Cap

Roof Flashing

Roof Rafters

Ceiling Joists

Vent Pipe

Exterior Wall

Sheathing

Outside Vent

Termination

Figure 24: Through Wall Installation with Exterior Blower Kit; Vertical Termination.

17

Image 17
Contents Mini Table of Contents Introduction Introduction Screws to take out to remove stove from Pallet InstallationDimensions of Mini 91.5 cm Crawlspace, narrow Walkway Closely Fresh AIR Intake 75mm Wall thimble Manufactured by pellet vent manufacturer Allows installation with the least amount Is the recommended installation set up Place a non-combustible hearth pad where Refer to Figures 17 Exterior Blower Kit Through vent holeThrough Wall Installation with Exterior Blower Kit Sheathing To install the Optional slider damper rod, remove the left Special Notes Kit Components Installing the PanelsInstalling Hopper Lid Installing Hopper LidStove will not start TroubleshootingStove will not operate when hot Light # 2 on Heat output bar flashing 200 F 93 C high limit temperature sensor has trippedExhaust motor will not function normally Convection blower will not function normally Control settings Heat Level has no effect on the fireIgnitor- the pellets will not light Stove keeps going out5V DC Wiring DiagramReference Description Part Number Parts ListParts List Parts Diagram Components Parts Diagram Steel For the do-it-yourself Individual WarrantyName of Owner Address Installation Data Sheet