Installation

VENT TERMINATION REQUIREMENTS:

IT IS RECOMMENDED THAT YOUR PELLET STOVE BE INSTALLED BY AN AUTHORIZED DEALER/INSTALLER. Table 1: Use in conjunction with Figure 6 for allowable exterior vent termination locations.

Letter

Minimum Clearance

Description

 

 

 

A

24 in (61 cm)

Above grass, top of plants, wood, or any other combustible materials.

 

 

 

B

48 in (122 cm)

From beside/below any door or window that may be opened.

 

 

 

C

24 in (61 cm)

From above any door or window that may be opened.

 

 

 

D

24 in (61 cm)

To any adjacent building, fences and protruding parts of the structure.

 

 

 

E

24 in (61 cm)

Below any eave or roof overhang

 

 

 

F

12 in (30 cm)

To outside corner.

 

 

 

G

12 in (30 cm)

To inside corner, combustible wall (vertical and horizontal terminations).

 

 

 

H

3 ft (91 cm) within a height of 15 ft (4.5

To each side of center line extended above natural gas or propane meter/regulator assembly or

 

m) above the meter/regulator assembly

mechanical vent.

 

 

 

I

3 ft (91 cm)

From any forced air intake of other appliance

 

 

 

J

12 in (30 cm)

Clearance to non-mechanical air supply inlet to building, or the combustion air inlet to any appliance.

 

 

 

K

24 in (61 cm)

Clearance above roof line for vertical terminations.

 

 

 

L

7 ft (2.13 m)

Clearance above paved sidewalk or paved driveway located on public property.

 

 

 

1. Do

not

terminate

 

 

 

 

 

 

 

 

the

vent

in

any

 

 

 

 

 

 

K

G

enclosed

or

semi-

 

 

 

 

 

 

 

enclosed

 

areas

 

 

 

 

 

 

 

 

such

as a carport,

 

 

 

 

 

 

E

 

garage,

 

attic,

D

 

Opens

B

C

 

G

crawlspace, narrow

F

 

 

 

 

G

 

 

walkway,

closely

 

Opens

 

 

 

 

 

 

B

A

 

I

 

 

L

fenced area, under

 

 

 

Opens

 

 

 

 

 

 

 

 

 

 

 

a sundeck or porch,

 

Termination Cap

 

Gas Meter

H

 

 

or

any

location

 

Air Supply Inlet

G

Restriction Zone

 

 

 

 

 

(Termination not allowed)

 

 

that

can

build

up

Figure 6: Use in conjunction with Table 1 for allowable exterior vent termination locations.

a concentration

of

 

 

 

 

 

 

 

 

fumes such as stairwells, covered breezeway, etc.

2.Vent surfaces can become hot enough to cause burns if touched by children. Non-combustible shielding or guards may be required.

3.Termination must exhaust above the inlet elevation. It is recommended that at least five feet of vertical pipe be installed outside when the appliance is vented directly through a wall, to create some natural draft to prevent the possibility of smoke or odor during appliance shut down or power failure. This will keep exhaust from causing a nuisance or hazard from exposing people or shrubs to high temperatures. In any case, the safest and preferred venting method is to extend the vent through the roof vertically.

4.Distance from the bottom of the termination and grade is 12” (30 cm) minimum. This is conditional upon the plants and nature of grade surface. The exhaust gases are hot enough to ignite grass, plants and shrubs located in the vicinity of termination. The grade surface must not be lawn.

5.If the unit is incorrectly vented or the air to fuel mixture is out of balance, a slight discoloration of the exterior of the house might occur. Since these factors are beyond the control of Sherwood Industries Ltd, we grant no guarantee against such incidents.

NOTE: Venting terminals can not be recessed into walls or siding.

8

Image 8
Contents Mini Table of Contents Introduction Introduction Installation Screws to take out to remove stove from PalletDimensions of Mini 91.5 cm Crawlspace, narrow Walkway Closely Fresh AIR Intake 75mm Wall thimble Manufactured by pellet vent manufacturer Allows installation with the least amount Is the recommended installation set up Place a non-combustible hearth pad where Refer to Figures 17 Through vent hole Exterior Blower KitThrough Wall Installation with Exterior Blower Kit Sheathing To install the Optional slider damper rod, remove the left Special Notes Installing the Panels Kit ComponentsInstalling Hopper Lid Installing Hopper LidStove will not start TroubleshootingStove will not operate when hot Light # 2 on Heat output bar flashing 200 F 93 C high limit temperature sensor has trippedExhaust motor will not function normally Control settings Heat Level has no effect on the fire Convection blower will not function normallyIgnitor- the pellets will not light Stove keeps going outWiring Diagram 5V DCParts List Reference Description Part NumberParts List Parts Diagram Components Parts Diagram Steel Warranty For the do-it-yourself IndividualInstallation Data Sheet Name of Owner Address