Bosch Appliances Model GWH 425 manual Installation instructions Masonry chimney

Page 10

Installation instructions

Masonry chimney

Masonry chimneys shall be built and installed in accordance with NFPS 211 or local codes. A minimum 5" diameter gas vent pipe (metal double wall Type B), or an approved clay flue liner or a listed chimney lining system must be used when venting into a naturally drafting, internal masonry chimney. 6 inch is required in elevations greater than 2000 feet, see Fig. 10. Local codes may require the use of both gas vent and an approved lining system when venting into a masonry chimney. The Commonwealth of Massachusetts requires the use of a listed liner. Lining systems include approved clay flue lining, a listed chimney lining system or other approved material that will resist corrosion, erosion, softening, or cracking from exhaust flue gases at temperatures up to 1800 degrees F. The lining system must be listed for use with naturally drafting, draft hood equipped gas appliances. Follow local codes and refer to NFGC 54 and NFPA 58.

LOWEST DISCHARGE OPENING

H (minimum) height from roof to lowest discharge opening

LISTED GAS VENT

ESTABLISH A ONE FOOT RISE BEFORE ANY ELBOWS

LISTED VENT CAP

X

 

12

 

ROOF

MINIMUM 6

PITCH IS

X/12

FEET (1.8M)

Existing interior masonry chimney

The metal gas vent pipe should be permanently mounted inside the masonry chimney. Double wall Type B gas vent is recommended. The masonry chimney may have to be tile or metal lined before the insertion of the gas vent pipe; check local codes for clarification. The lining material must be listed for use only with naturally drafting, draft hood equipped gas appliances. Follow manufactures instructions for installation of listed lining material. You may not vent any other fuel burning appliances into any free space remaining in the chimney. The minimum vertical gas vent length within the masonry chimney should be no less than 6 ft (1.8 m); the vent terminator should extend at least 3 feet (0.9

m)above where the chimney meets the roofline and at least 2 feet (0.6 m) higher than any vertical wall or similar obstruction within 10 feet (3.1 m). The top of the gas vent should have an approved vent terminator. See Fig. 12.

Fig. 11 Pitch roof

GAS VENT TERMINATIONS FOR LISTED VENT CAPS

Roof pitch

H (minimum) feet

meters

Flat to 6/12

1.0

0.30

 

 

 

6/12 to 7/12

1.25

0.38

 

 

 

Over 7/12 to 8/12

1.5

0.46

 

 

 

Over 8/12 to 9/12

2.0

0.61

 

 

 

Over 9/12 to 10/12

2.5

0.76

 

 

 

Over 10/12 to 11/12

3.25

0.99

 

 

 

Over 11/12 to 12/12

4.0

1.22

 

 

 

Over 12/12 to 14/12

5.0

1.52

 

 

 

Over 14/12 to 16/12

6.0

1.83

 

 

 

Over 16/12 to 18/12

7.0

2.13

 

 

 

Over 18/12 to 20/12

7.5

2.27

 

 

 

Over 20/12 to 21/12

8.0

2.44

Table 2

 

LISTED

GAS

VENT CAP

VENT

 

VENT

 

CONNECTOR

 

Establish a

 

one foot

 

rise before

 

any elbows

 

Fig. 12 Masonry chimney

10

6 720 608 034

Image 10
Contents GWH-425-PN-N GWH-425-PN-L Index IndexAppliance details GWH 425 PN specifications Technical dataOver heat prevention temperature limiter Water resistant Appliance detailsUnpacking the GWH 425 PN heater General rules to follow for safe operationDimensions and installation clearances Dimensions in Inches and mmHeater placement and clearances Installation instructionsProper location for installing your heater Installation instructionsMounting Heater Screws Incandescent particle trayCombustion air requirements Appliances located in confined spacesVenting Installation instructions Masonry chimney Existing interior masonry chimneyGas piping & connections GAS ConnectionsFor Natural GAS Measuring gas pressure Connecting manometer Shut off gasConnecting the pressure relief valve PRV Water connectionsRecirculation application For your safety read before operating your water heaterOperation instructions Operation instructionsLighting instructions To turn off applianceTemperature adjustment knob Setting the water temperatureDraining water from heater Water valve Maintenance and serviceMaintenance intervals PilotMineral scale build-up Vent assemblyMain burners Operate the circulating pumpIntroduction Pilot does not light TroubleshootingPilot lights, but goes out when button is released Pilot goes out during or after hot water useBurners do not light with water flow Hot water temperature fluctuates at tapCheck for a clogged inlet water filter screen see chapter Water is not hot enough Noise when heater is runningWater is too hot Burners ignite without hot water flowBurners do not operate cleanly yellow flames when operating Protecting the environment Protecting the environmentSaving water resources Interior components and diagram parts list Interior components and diagram parts listInterior components Components diagram Components DiagramParts list Description ReferenceFifteen Year Limited Warranty Gas Pressure Reading Static Bosch Group Bosch Water Heating Mad River ParkSerial Number Waitsfield, VT all rights reserved