Bradford-White Corp GX1-55S, GX2-25S manual

Page 22

WARNING

Install a discharge line so that water discharged from the temperature and pressure relie f valve will exit within six (6) inches above, or any distance below, the structural floor and cannot contact any live electrical part. The discharge line is to be installed to allow for complete drainage of both the temperature and pressure relief valve and the discharge line. The discharge opening must not be subjected to blockage or freezing. DO NOT thread, plug, or cap the discharge line. It is recommended that a minimum clearance of four (4) inches be provided on the side of the water heater for servicing and maintenance of the combination temperature and pressure relief valve

Do not place a valve between the combination temperature and pressure relief valve and the tank!

SACRIFICIAL ANODES—Three sacrificial anode rods have been installed in the tank head to extend tank life. The anode rods should be inspected annually to determine the amount of sacrificial decay and replaced when necessary to prolong tank life. Water conditions in your area will influence the time interval for inspection and replacement of the anode rod. The use of a water softener may increase the speed of anode consumption. More frequent inspection of the anode is needed when using softened (or phosphate treated) water. Contact the plumbing professional who installed the water heater or the manufacturer listed on the rating plate for anode replacement information.

22

Image 22
Contents SINGLE-WALL Indirect Page Congratulations Section Important InformationPage If YOU Smell GAS Page Page Page Page Page Table of Contents Specifications ModelSW-2-80-L SW-80C-5 SW-2-120-L Model Gal LbsMinutes Sq Ft Compliance with the code Features General InformationPage Temperature and Pressure Relief Valve Page Page PRE-INSTALLATION UnpackingSystem Zone Control Page Domestic HOT Water Priority Component Location Appliance Location Water Connections Install Temperature and Pressure Relief Valve if not factory installedInstructions for Boiler Connections Connect Water Boiler Supply PipingWater Boiler Piping with Zone Valves Connect Steam Boiler Supply Piping Fill Boiler SystemElectrical Connections Page Aquastat Control System START-UP Operating InstructionsSequence of Operations Water Temperature Adjustment Approximate TIME/TEMPERATURE Relationships in ScaldsPage Aquastat Control Page Maintenance To inspect or replace an anode Page Problem Cause Solution Trouble Shooting GuideProblem Cause Solution Parts List Part Name & Description