SECTION IV
PRE-INSTALLATION
UNPACKING
INSPECT SHIPMENT carefully for any signs of damage. If damage is noted, do not install the product. Contact the shipper or manufacturer listed on rating plate. All equipment is carefully manufactured, inspected, and packed. Our responsibility ceases upon delivery of the packaged heater to the carrier in good condition.
NOTE: Any claims for damage or shortage in shipment must be filed immediately against the carrier by the consignee.
IMPORTANT DECISIONS EQUIRED
BEFORE INSTALLATION
SIZING
1.Boiler DOE Heating Capacity – The
New Rating = (maximum first hour rating) x
Actual Boiler Output Capacity
Minimum Boiler Output Capacity
For example, what would the 140°F first hour rating be if model
23