American Water Heater ADCG, DCG3-Series, 71681 warranty Clearances and Accessibility

Page 5

Index

 

 

Important:

Figure1: Minimum Clearance Locations

The water heater should be located in an area where

 

 

leakage of the tank or connections will not result in dam-

 

 

age to the area adjacent to the water heater or to lower

 

 

floors of the structure. Due to the normal corrosive

Back

Sides

action of the water, the tank will eventually leak after

 

an extended period of time. A suitable metal drain pan

 

 

should be installed under the water heater as shown

 

 

below, to help protect the property from damage which

 

 

may occur from leaks in the piping connections or tank.

 

 

The pan must limit the water level to a maximum depth of

 

 

1 3/4 inches (45mm) and be 2 inches (51mm) wider than

 

 

the water heater and piped to an adequate drain. The

 

 

pan must not restrict combustion airflow. Locate the

 

 

water heater near a suitable indoor drain. Outside drains

 

 

are subject to freezing temperatures which can obstruct

Top View

Front 24” min.

the drain line. The piping should be at least 3/4” (19mm)

 

for service

ID and pitched for proper drainage. Under no circum-

 

Vent

stances will the manufacturer or seller of this water heater

 

 

be held liable for any water damage which is caused by

 

 

your failure to follow these instructions.

 

 

Top to ceiling

Pipe to

adequate

drain

1 3/4” Max

At least 2” greater than the diameter of the water heater

Clearances and Accessibility

Notice: Minimum clearances from combustible materials are stated on the data plate located on the front of the water heater.

• If the water heater is installed in a restaurant

 

 

 

 

 

 

 

 

or food service location where the floor is

 

 

 

 

 

 

 

 

cleaned frequently, NSF International requires

 

 

 

 

 

 

 

 

the water heater to maintain 6 inches (150mm)

 

 

 

 

Sides

of clearance above the floor. To comply with the

 

 

 

 

 

 

 

 

 

 

 

 

NSF International requirement, install leg

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

extension kit. For availability contact

 

 

 

 

 

 

 

 

1-800-456-9805

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The water heater is certified for installation on a

combustible floor.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Important: If installing over carpeting, the carpeting

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

must be protected by a metal or wood panel beneath

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

the water heater. The protective panel must extend

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

beyond the full width and depth of the water heater by

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

at least 3 inches (76mm) in any direction, or if in an

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

alcove the entire floor must be covered by the panel.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Front View

The panel must be strong enough to carry the weight of

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

the water heater when full of water.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Figure 1 may be used as a reference guide to locate

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

the specific clearance locations. A minimum of 24

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

inches (610mm) of front clearance and 4 inches

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(102mm) on each side should be provided for inspection

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

and service.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5

Image 5
Contents Installation Instructions Use & Care Guide Table of Contents Installer and Owner Responsibilities Installation InstructionsConsumer Information Unpacking the Water HeaterSite Location Installation RequirementsPan must not restrict combustion airflow. Locate Clearances and AccessibilityFloors of the structure. Due to the normal corrosive Venting COMBUSTION/VENT Pipe SystemCombustion General Air RequirementsCombustion Air Supply Ducts Louvers and GrillsEquipment Located in Confined Spaces ALL AIR from Outdoors Air Opening RequirementsFlue Outlet Reducer Draft Hood/Damper InstallationTempering Valve Installation Piping InstallationWater System Piping Space HeatingRelief valve if required Please note the following Discharge Line Temperature & Pressure Relief ValveGas Requirements GAS Supply and PipingGas Piping Gas PressureGas Pressure Testing Electrical Connections Electrical InstallationWiring Diagram Water Heater Location Requirements Installation ChecklistVent Pipe System Vent TerminationWater Heater Operation Operating Your Water HeaterPropane Models Stacking Water Temperature RegulationChecking the Draft Emergency Shut DownBurner Flames Operational ConditionsDraining and Flushing Maintenance of Your Water HeaterPilot Burner and Main Burner Assembly Inspection Clean flame PowerFaulty Check continuitySensor Resistance vs. Temperature Resistance K ohms Thermostat Troubleshooting Flow ChartPart Name and Description Repair Parts Illustration