Introduction
| Preferred |
Process | Cell Locations |
| |
| Pump |
Cool er
a/n 23340
Figure 1-2 Recommended Locations for Mounting a Conductivity Cell
*Maximum allowable operating temperature for piping arrangements depends on the type of pipe tee chosen.
Flow
(a) Cell Mounted in 3/4" NPT Pipe Tee* (Customer Supplied)
Flow
(b) Cell Mounted in PES Flow Chamber
a/n 23341
Figure 1-3 Two Piping Arrangements for the Cell
10/07 | Installation and Maintenance Manual | 3 |