American Standard 6067.26X Adjust Supply Stop Fig, Remove Front PANEL. For removing front panel

Page 11

13 HOWTO INSTALL NEW BATTERY;

Fig. 16

1. Remove FRONT PANEL. For removing front panel

see Step 9 for instructions.

2. Remove the four COVER SCREWS (1) and COVER

(2) from ELECTRICAL BOX (3). Fig. 16.

3. Disconnect GREY SENSOR WIRE (4) from CIRCUIT

BOARD (5).

4. Remove CIRCUIT BOARD (5) from ELECTRICAL

BOX (3). Fig. 16a.

5. With your thumbs, spread the two TABS (6) on

battery holder apart and remove the BATTERY (7).

Fig. 16

4

1

3

2

T O P

5

2.Install NEW BATTERY (7) into holder on DC circuit board. Press BATTERY (7) down (contacts facing downward) into position until TABS (6) lock BATTERY (7) into place.

6.Install CUIRCUIT BOARD (5) and connect GREY SENSOR WIRE (4).

7.Install COVER (2) and SCREWS (1).

8.Replace and FRONT PANEL. See Step 9 for instructions on installing front panel.

Fig. 16a

3

7

5

 

6

14ADJUST SUPPLY STOP; Fig. 17

IMPORTANT: To avoid overflowing, the SUPPLY STOP

(2)must never be opened to the point where the flow from the valve exceeds the flow capacity of the fixture. The fixture must be able to handle a continuous flow in case of a flush valve failure.

Valve is designed to provide stated flush volume with a 25 GPM flow rate.

1.After installation is complete, peel off the PROTECTIVE FILM (1) from the sensor. Standing to one side, block the sensor with your hand for 10 seconds. Remove your hand and listen for audible“click” from within the valve.

2.Turn on SUPPLY STOP (2) 1/4 turn to 1/2 turn(CCW) and test for leaks. Note: Unit may flush for approximately 5 to 10 sec. when water is first turned on. If flow persists, turn water off and repeat step #1 above.

3.Actuate the FLUSH VALVE:

A)Cover sensor with hand for 10 seconds.

NOTE: Stand outside of sensor detection aera.

B)Remove hand from in front of the sensor; unit will flush in approximately 3 seconds.

4.Adjust SUPPLY STOP (2) after each flush until the stated flush volume is achieved, no splashing occurs and the fixture is properly cleansed.

Fig. 17

COUNTER-CLOCKWISE

OPENS CONTROL STOP

CLOCKWISE CLOSES

CONTROL STOP

2

1

10

M968550 REV. 1.5

 

Image 11
Contents Concealed Flushometer For 1-1/2Top or Back Spud Bowls Installation InstructionsUnpacking InstallationRecommended Tools Fig Roughing-in DimensionsPrior to Installation Following items must be installedFlush OUT Supply Lines Fig Install Electrical BOXAssembly Fig Install Sweat Solder Adapter FigConsult Code for details Install Vacuum Breaker and Flush Connections FigConnect Flush Valve to Piping Fig Install Flush Valve FigConnect Front Panel to Electrical BOX AC PowerInstall the Sensor Wire Grommet 15 into Install Front Panel Fig Connect Front Panel to Electrical BOX DC Power Battery FigConnect Solenoid Wiring and Power Supply Fig Connect Override HOSES, AC & DC Power FigFor AC-VERSION Unit #1Unit #2 Unit #3See for instructions Adjust Supply Stop FigRemove Front PANEL. For removing front panel Stand outside of sensor detection aera Howto SET Detection Range If RequiredTroubleshooting Flow Charts Selectronic