Mitsubishi Electronics 20-L, 20 PRH-5, 8, 10, 15 Electrical Wiring, Final Checks, Trial Operation

Page 54

5.Electrical Wiring

Remove the panel on the right side (PR,PRH-5 10) or the rear side (PR,PRH-15,20) of the unit and connect the units power supply wiring to the proper terminals in the control box, as shown below.

 

 

 

PR-5YC

PR-8YC

PR-10YC

PR-15YC

PR-20YC

 

MODEL

 

PRH-5YA

PRH-8YA

PRH-10YA

PRH-15YA

PRH-20YA

 

 

 

PRH-5YA-L

PRH-8YA-L

PRH-10YA-L

PRH-15YA-L

PRH-20YA-L

INDOOR FAN MOTOR OUTPUT

<kW>

0.75

1.1

1.1

 

1.5

1.5

2.2

2.2

3.0

3.0

4.0

 

 

<mm2>

 

 

 

 

 

 

 

 

 

 

 

WIRING

POWER SUPPLY

5.5

 

5.5

8

22

22

EARTH

<mm2>

5.5

 

5.5

8

22

22

 

 

MAIN SWITCH

< A >

40

 

50

60

100

100

Std.

Terminal block

Control box

Terminal block

 

Control box

power supply

Wiring for PR,PRH-510(right side view)

TN-NET SYSTEM (For European models only)

power supply

Wiring for PR,PRH-15,20(rear view)

L1

L2

L3

N

PE

Note:

All electrical wiring must be comply with local electrical authority regulations.

6.Final Checks

After having installed the unit, check that:

(1)The unit is fixed securely.

(2)The unit is installed properly.

(3)The drain pipe is provided with a drain trap.

(4)The electrical wiring has been connected correctly and the terminal screws have been properly tightened.

(5)The duct work has been performed correctly.

7.Trial Operation

(1)Before turning the unit on, measure the resistance between the terminals of the electrical parts and ground with a 500V megger and check that the value is at least 1MΩ . If the measured value is below 1MΩ , do not operate the unit.

(2)Check the operation of the high pressure switch by activating it. Operation should stop when the two leads of the outdoor unit fan motor are removed from the contactor and cooling continues for 5~10min.

(3)Check that the indoor and outdoor fans are rotating in the proper direction.

(4)After having checked the above points, proceed with a trial operation of the unit.

- 53 -

Image 54 Contents
Data Book Heat PumpContents Safety for USE For correct installationDo not wash the unit with water Complete Line UP Features High Sensible Cooling CapacityMechanical Specifications DescriptionsTypical Installation Example PRH PRH-LSpecifications GrossElectrical Data CoolingHeating Factor for Various Air Flow Capacity TablesCooling Capacity Nominal Air FlowPR-5YC,PRH-5YA,PRH-5YA-L PR-5YC PRH-5YA-LHeating Capacity Nominal Air FlowPRH-5YA,PRH-5YA-L Range PRH-5YACooling Capacity Nominal Air FlowPR-8YC,PRH-8YA,PRH-8YA-L PR-8YC PRH-8YA-L PRH-8YAHeating Capacity Nominal Air FlowPRH-8YA,PRH-8YA-L PR-8YC PRH-8YA-LPRH-8YA Cooling Capacity Nominal Air FlowPR-10YC,PRH-10YA,PRH-10YA-L PR-10YC PRH-10YA-L PRH-10YAHeating Capacity PRH-10YA-LPRH-10YA Cooling Capacity Nominal Air FlowPR-15YC,PRH-15YA,PRH-15YA-L PR-15YC PRH-15YA-L PRH-15YAPR-15YC PRH-15YA-L PRH-15YACooling Capacity Nominal Air FlowPR-20YC,PRH-20YA,PRH-20YA-L PR-20YC PRH-20YA-L PRH-20YAPRH-20YA-L PRH-20YAPRH-YA Operation rangePR-YC PRH-YA-LFAN Performance RpmOperation range Fan speed Pressure Pulley outside dimensions are shown below Unit mm NC Curves PR-5YC PRH-5YA PRH-5YA-L PR-8YC PRH-8YA PRH-8YA-LPR-10YC PR-15YCOutline Dimensions PR-20YCPR-8,10YC PRH-8, 10YA PRH-8, 10YA-L PR-15,20YC PRH-15, 20YA PRH-15, 20YA-LWiring Diagrams PR-5, 8, 10YC StandardPR-15, 20YC Standard PR-5, 8, 10YC Special Order K ControlSpecial Order LOW Temperature Internal ProtectorPR-15, 20YC Special Order K Control & LOW Temperature 50HertzPRH-5, 8, 10YA PRH-5, 8, 10YA-L StandardPRH-15, 20YA-L Standard PRH-5, 8, 10YA PRH-5, 8, 10YA-L 10YA PRH-15, 20YA PRH-15, 20YA-L 21S4 Way valve OFF 52C OFF MC Stop MF2 Stop RL on CH on Service Call Electrical Operation Flow ChartsMC Operate MF2 Operate OFF Safety Device OFF? YES MF1 Operate YESMF1 Operate Start Power on Start Power on Refrigerant Schematics PR-5YCPR-8, 10, 15, 20YC PRH-8, 10, 15, 20YA PRH-8, 10,15,20YA-L Safety & Control Devices Accessory Availability Physical Data ElectricalRooftop Package AIR Cooled Heatpump and Cooling only Units Installation ClearancesRoof Mounting Duct Work Drain pipingElectrical Wiring Final ChecksTrial Operation Instructions for USE Check Points for OperationMaintenance FingermarksTroubleshooting Preparing for Operation After Prolonged ShutdownPreparing for Prolonged Shutdown Specification Guidelines Memo Mitsubishi Electric Corporation Data Book PR,PRH