
ENGLISH
| Contents | 
 | 
| 1. Safety precautions | 3 | 
| 1.1. Before installation and electric work | 3 | 
| 1.2. Before getting installed | 3 | 
| 1.3. Before getting installed (moved) - electrical work | 4 | 
| 1.4. Before starting the test run | 4 | 
| 2. Combination with indoor units | 5 | 
| 3. Confirmation of parts attached | 5 | 
| 4. Outdoor unit configuration | 6 | 
| 5. Selection of installation site | 6 | 
| 6. Space required around unit | 7 | 
| 6.1. Individual installation | 7 | 
| 6.2. Collective installation and continuous installation | 8 | 
| 7. Lifting method and weight of product | 8 | 
| 8. Installation of unit | 9 | 
| 8.1. Location of anchor bolt | 9 | 
| 8.2. Installation | 9 | 
| 8.3. Connecting direction for refrigerant piping | 10 | 
| 8.4. Noise level | 10 | 
| 9. Caution for snow and seasonal wind | 11 | 
| 9.1. Snow and seasonal wind | 11 | 
| 9.2. Countermeasure to seasonal wind | 11 | 
| 10. Refrigerant piping installation | 12 | 
| 10.1. Areas of caution | 12 | 
| 10.2. Refrigerant piping system | 13 | 
| 10.3. Precautions concerning piping connection and valve | 
 | 
| operation | 15 | 
| 10.4. Oil balance pipe connection method | 18 | 
| 10.5. Distributor (gas) connection method | 19 | 
| 10.6. How to install branch pipe | 20 | 
| 10.7. Airtight test and evacuation | 21 | 
| 10.8. Thermal insulation of refrigerant piping | 22 | 
| 11. Electrical work | 24 | 
| 11.1. Caution | 24 | 
| 11.2. Control box and connecting position of wiring | 25 | 
| 11.3. Wiring transmission cables | 27 | 
| 11.4. Wiring of main power supply and equipment | 
 | 
| capacity | 33 | 
| 12. Test run | 34 | 
| 12.1. Checking before getting test run | 34 | 
| 12.2. Test run method | 34 | 
| 12.3. How to cope with test run abnormality | 35 | 
| 12.4. Coping with remote controller abnormality | 37 | 
| 12.5. The following phenomena do not represent | 
 | 
| abnormality (emergency) | 38 | 
2