Electrolux RH36PC80GSB Ceiling Support Structures, Framing must be capable of supporting 150lbs

Page 9

Installing the hood



 

 

 

 

 

Ceiling Support Structures

This vent hood is heavy.

Adequate structure and support must be provided in all types of installations.

At the hood location, install 2”x 4” cross framing between ceiling joists as shown. (2”x 4” are required to support the weight of the hood.)

Arrange cross framing in the ceiling to suit the existing structure.

Your ceiling joists will be like one of the following examples.

8 1/2

4 12/16(At least)

8’ Ceiling: 24” (minimum)

9’ Ceiling: 30” (minimum)

NOTE: Do not cut the duct opening shown on the template for the recirculating installation.

IMPOR TANT

Framing must be capable of supporting 150lbs.

Image 9
Contents Installation, Use & Care Guide Please read and save this guide Table of contentsKeep a record for quick reference Questions?Important Safety Instructions Read and Save These Instructions Before installing the hood Electrical requirementsDo not use flex ducting List of Materials Optional accessoriesParts included in your hood Tools/Materials requiredTypical installation Installing the hoodDuctwork and wiring locations Installing preparationDuctwork installation guidelines Removing the packagingFraming must be capable of supporting 150lbs Ceiling Support StructuresWith 8 assembly screws 2 per corner Installing the hood Ceiling ducting Failure to do so can result in death or electrical shockAC, 15 or 20 Amp circuit required Air deflect installation Recirculating accessories Connecting the ductworkFeatures Control buttons Special functions For Best results To Clean Filters Care and cleaningFilters To Remove The Metal Grease FiltersCleaning Charcoal filter placement Recirculating accessoriesOptional Charcoal Filters Hood SurfaceWarranty Information LI288F