10 Installing the hood
Place the template on to ceiling considering the instructions for ceiling support structures. Always consider the “front of hood” legend when placing the template on the ceiling. It will dene the control’s location.
Mark with a pencil the hole locations for screws in the ceiling.
Remove template.
Secure the upper horizontal support with 4 wood screws.
B |
A |
Place the hood over a table protecting the glass Attach the 4 lower vertical supports (A) to the hood with 16 assembly screws (4 per corner). Then attach the lower horizontal support
(B) with 8 assembly screws (2 per corner).
click! |
Carefully lift the assembly until the upper vertical supports are locked with the 4 upper horizontal support’s springs. Secure with 16 assembly screws (4 per corner).
Note: At least 2 persons are needed for this operation.
C
The upper vertical supports’ position will determine the hood’s total height. Refer to the maximum and minimum extensions line drawing to determine which is the most suitable dimension according to your ceiling’s height.
Always take into consideration the minimum installation heights declared in this manual. Position the upper vertical supports (C) at the proper height and attach them with 16 assembly screws (4 per corner).
Attach the stainless steel duct cover supports using 4 assembly screws.