Hotpoint EG73 EG76, EG54 manual Technical Data Dimensions, General

Page 26

INSTALLATION INSTRUCTIONS

TECHNICAL DATA

DIMENSIONS

Height

900 - 915mm

Width

600mm

Depth

595mm (excluding door handles)

GENERAL

Gas connection

Rp /

 

(

/ ” BSP female)

 

1

2

 

1

2

Pressure test point

Hotplate burner injector.

Gas rate adjustment

None

 

 

 

Aeration adjustment

None

 

 

 

Electrical connection

4mm2

twin and earth.

230-240V a.c. 50Hz.

 

Natural Gas

 

LPG

 

 

 

 

 

 

 

Heat Input

Injector

Heat Input

 

Injector

 

 

 

 

 

 

HOTPLATE

3.0kW

128

2.8kW

 

82

Front left and rear right

(205g/h)

 

 

 

 

 

 

 

 

 

 

 

HOTPLATE

1.9kW

102

1.8kW

 

65

Front right and rear left

(130g/h)

 

 

 

 

 

 

 

 

 

 

 

GRILL

 

2.4 / 2.6kW

 

 

 

 

 

 

 

TOP OVEN

 

1.7 / 1.85kW

 

 

 

 

 

 

 

MAIN OVEN

 

2.3 / 2.5kW

 

 

 

 

 

 

 

 

26

Image 26
Contents Instructions Contents Introduction For Your Safety Please read the precautions below before using your cookerNever Automatic Cooking Guidance on Automatic CookingClockface SymbolsTimer Function Buttons Auto Cooking ProgrammeSetting the Time of DAY Setting the Minute MinderAuto Cooking Programmes Timer Operation EG73, EG76 Other Notes on Timer Operation Timer Operation EG54 19.50 Hotplate To USE the HotplateSafety Requirements for Deep FAT Frying HOW to Deal with a FAT FireTo USE the Grill GrillGrill PAN Handle To USE the TOP Oven OvensTOP Oven Conventional Cooking Main Oven FAN CookingOven Cooking Chart Top Oven CookingBaking Fan Oven CookingSlow Cooking ‘S’ Setting Preparing Food for Slow CookingReplacement of Oven Light Bulb Care and CleaningOven Heat Clean Linings Cooker Finish Cleaning Method Problem Check Something Wrong with Your CookerDisposal of Your Product Model Numbers EG54, EG73, EG76 Installation InstructionsGAS Safety Installation & USE Regulations LocationTechnical Data Dimensions GeneralUnpacking the Cooker Space for FixingCooker Hoods Viewed from Rear Stability Bracket Connecting to GAS SupplyLevelling Operational Checks Installation InstallationsElectrical Installation Page Page Key Contacts