DeLonghi DEBIGE 2440 SS warranty Gas connection, Explosion Hazard, Manual Shut-off Valve fig

Page 25

gas connection

Explosion Hazard

Use a new CSA or UL approved gas supply line.

Install a shut-off valve.

Securely tighten all gas connec- tions.

If connected to LP, have a quali- fied person make sure gas pres- sure does not exceed 14" water column.

Examples of a qualified person include licensed heating per- sonnel, authorized gas compa- ny personnel, and authorized service personnel.

Failure to do so can result in death, explosion, or fire.

All gas connections must be made according to national and local codes. This gas supply (service) line must be the same size or greater than the inlet line of the appliance. Sealant on all pipe joints must be resistant to the action of LP/Propane gas.

The oven is equipped for the use with NATURAL gas. It is design-certified by CSA International for NATURAL and L.P. gases with appropriate conversion.

The model/serial rating plate, located on the back of the oven, has information on the type of gas that can be used. If this information does not agree with the type of gas available, check with the local gas supplier. See page 29 for L.P. gas conversion instructions.

1. Manual Shut-off Valve (fig. 7.1):

The supply line shall be equipped with an approved shutoff valve. This valve should be located in the same room as the oven and should be in a location that allows ease of opening and closing (in a position where it can be reached quickly in the event of an emergency).

Do not block access to the shutoff valve. The valve is for turning on or shutting off gas to the appliance.

Shutoff valve

“open” position

To oven

Gas supply line

Fig. 7.1

2. Pressure Regulator:

a)All heavy duty, commercial type cooking equipment must have a pressure regulator on the incoming service line for safe and efficient operation, since service pressure may fluctuate with local demand.

Before installing the regulator mount the 3/8” NPT (conical) male connector to the regulator (see picture 7.2a). Gasket supplied have to be placed between 3/8” NPT (conical) connector/manifold male pipe fitting (see picture 7.2b).

The regulator supplied with this oven must be installed before any gas connections are made.

Use supplied pressure regulator only.

25

Image 25
Contents BUILT-IN Dual Fuel Double Oven What to do if YOU Smell GAS Dear Customer User Instructions Important Precautions and RECOM- MendationsRemove the door before disposal to prevent entrapment Control panels Very Important Notice Electronic Alarm Electronic clock/end cooking timerSetting the Frequency of the Alarm Sound Electronic Clock figGeneral Features How to use the lower gas ovenUsing the Oven for the First Time Oven BurnerOven Cooking Ignition of the Oven BurnerOven Light Ignition of the Broil BurnerBroiling Temperature Selector Knob fig How to use the upper electric ovenUsing the Oven for the First Time Operating PrinciplesFunction Selector Knob fig Regeneration SterilizationRoasting Cooking Different Dishes AT the Same TimeWrong Ventilated Broiling and BroilingGeneral Recomandation Cleaning and maintenanceEnamelled Parts Inside of OvenLower GAS Oven Accessories Installation and Removal Upper Electric Oven Accessories Installation and RemovalReplacing the Oven Light Oven Doors Door AssemblyRemoving the Oven Doors DO’S and do NOT’S For Your SafetyTools Needed for Installation Installation InstructionsElectrical Grounding Instructions Replacement PartsInstallation to the Cabinet InstallationMaximum Explosion Hazard Gas connectionManual Shut-off Valve fig Pressure RegulatorLock Pressure Regulator Installation StepGAS Connection Specification Rigid Pipe Connections Flexible ConnectionsSetting the Pressure Regulator Leak TestingConversion to LP/PROPANE GAS Injectors TableOven burner Adjustment of the Oven Burner Minimum Recommended ground method Electrical connectionLower Oven Upper Oven Electric diagram keyPage Page Code 1102633 ß9