INSTALLATION
UNPACKING
Immediately after unpacking the dishwasher, check it for possible shipping damage. If this machine is found to be damaged, save the packaging material and contact the carrier within 15 days of delivery.
Prior to installation, verify that the electrical service agrees with the specifications on the machine data plate which is located to the right of the control box.
LOCATION
Before finalizing machine location, make sure that consideration has been given for water supply, drain connection, electrical conduit, tabling, chemical containers and supply lines, as well as adequate clearance for opening the doors. A hood or vent may be required in order to meet local codes.
LEVELING
The dishwasher must be level before any connections are made. With the dishwasher in its operating location, turn the threaded feet as required to level the machine
CONVERTING FROM STRAIGHT-THROUGH TO CORNER OPERATION
The LT1 is shipped from the factory for straight- through operation. To convert to corner operation, move the rack track and splash guard as follows:
1.Remove the two screws and nuts that secure the front rack track and splash guard (Fig. 1) and remove the front rack track and splash guard. Reassemble the front rack track and splash guard by replacing the two screws and nuts in the same mounting holes from which they were removed.
SCREWS
FRONT RACK TRACK
AND SPLASH GUARD
Fig. 1
2.Remove the two screws and nuts at the outer edges of the splash guard (Fig. 2).
3.With the two screws and nuts removed in step 2, reattach the front rack track and splash guard to the left side of the rack track assembly, using the mounting holes (Fig. 3) provided.
SCREWS
Fig. 2
MOUNTING HOLES
Fig. 3
– 4 –