YSCFC SERIES FLATBOTTOM GAS FRYERS
CHAPTER 1: SERVICE PROCEDURES
1.6.6.2 Frypot/Firebox Removal/Replacement Procedure
1.Perform Procedure 1.6.5, Removing/Replacing Blower Assembly or Air Prover Switch, Steps 1 – 4.
2. Disconnect the union at the gas valve. Remove four bolts connecting the burner manifold brackets to the burner box. Remove the burner manifold assembly and set aside.
3. Mark and disconnect the
Remove drain elbow and drain valve assembly from the frypot.
Disconnect union at gas valve and remove four bolts (two per side) to remove burner manifold.
Disconnect union at gas valve and remove four bolts connecting burner manifold brackets to firebox and drain valve assembly from frypot.
4.Remove two screws from control panel and lower, using care not to stretch or distort indicator light wiring (if applicable). If control panel is equipped with indicator lights, mark and disconnect wiring and set control panel aside.
If equipped with indicator lights, use a
5.Perform Procedure 1.6.1, Remove/Replace Temperature Probe or