Frymaster YSCFC24GSERIES manual Yscfc Series Flatbottom GAS Fryers Service Procedures

Page 25

YSCFC SERIES FLATBOTTOM GAS FRYERS

CHAPTER 1: SERVICE PROCEDURES

A pump seized by debris or hard shortening must be disassembled, cleaned and reassembled as follows:

1.Disconnect power to the filter system.

2.Remove the front cover of the pump to access the gears inside, if the pump is accessible while still inside the cabinet. If the front cover is not accessible, the pump must be removed from the pump motor (remove input/output plumbing from the pump prior to removing pump). Remove setscrews to disengage the pump from the motor.

3.Prior to reassembly, the inside housing must be clean and free of any sediment or debris. Failure to completely clean the inside housing and ring gear will cause gear binding after reassembly.

4.During reassembly, partially install the housing bolts in a star pattern, leaving a ⅛-inch (3 mm) gap between the cover and housing flanges. Ensure there is no shortening or oil in the filter pan, and that the filter pan is disconnected. With the motor running slowly draw the cover in, evenly tightening the housing bolts. When the cover is snug on the housing tighten all bolts to 15 inch- lbs (1.7 Nm) ensuring that the pump is working correctly. Turn the motor off.

The electronics of the SUFF/UFF filtration system are simple and straightforward. Microswitches attached to handles for each vat and wired in parallel provide the 24 VAC required to activate the pump relay coil. When the handles are moved to the ON position, the activated pump relay coil pulls the pump motor switch in, supplying power to the pump motor.

Filter systems equipped with oil-return heaters are wired into the 120 VAC source, which remains energized as long as the unit is plugged in.

1-20

Image 25 Contents
YSCFC24G Series Flatbottom Gas Fryers Hour Service HotlinePage Computers Where Applicable FCC Yscfc Series Flatbottom Gas Fryers Table of Contents Functional Description Electronic Ignition ConfigurationNON-CE Altitudes of 2000 feet or less Thermatron Controller Board Control OptionsSafety Components Accessing Fryers for ServicingAdjusting Burner Manifold Gas Pressure Cleaning the Gas Valve Vent Tube if applicableCalibrating the Thermatron Temperature Controller Replacing Fryer Components Remove/Replace Temperature Probe or High-Limit ThermostatTemperature probe High-limit Removing/Replacing Rocker Switches Reverse the above steps for reassembly Removing/Replacing Blower Assembly or Air Prover Switch Frypot Baffle Inspection Replacing the FrypotFrypot/Firebox Removal/Replacement Procedure Yscfc Series Flatbottom GAS Fryers Service Procedures If the Firebox Requires Replacement Troubleshooting and Problem Isolation Ignition Failures Problems Related to the Electronic CircuitsImproper Burner Functioning Yscfc Series Flatbottom GAS Fryers Service Procedures Filtration Problems Improper Temperature ControlYscfc Series Flatbottom GAS Fryers Service Procedures Leakage Troubleshooting Guides Light Indication Probable Cause Corrective Action Indicator LightsWiring for Common Cabinet Flatbottom without Boil Out Wiring Diagrams2 24/24 Filter Wiring 3 18/24 Common Cabinet Transformer Box Blower Assembly and Combustion Air Yscfc Series Flatbottom GAS Fryers Parts ListBurner Manifold and Related Components Orifice Flue Caps, Top Caps, and Related Components Cover, 1824G Frypot use 106-2839SP for 2424G Frypot Cabinetry Oil Return Manifold Door Assemblies and Component Parts Control Panels, Wireways, and Related Components Control Panels, Wireways, and Related Components Suction Oil810-3088Oil Return Manifold 106-5461Oil Return Plumbing Oil Return and Suction ManifoldsFilter Unit Frypot, Drain, and Oil Return Components Firebox Assembly Drain Valve and Components Connectors 2-Pin Female 6-Pin Female 9-Pin Female Wiring Connectors, Pin Terminals, and Power CordsScrews, Nuts, and Fasteners Service Hotline