Bloomfield 8382 owner manual Servicing Instructions

Page 17

SERVICING INSTRUCTIONS (continued)

7.Set the tank back into the brewer. Reassemble the tank lid to the water tank. Make sure the gasket is properly in place, then reinstall the hold-down strap.

8.Reinstall wiring to heating element and thermostat. Reinstall the hi-limit thermostat . Verify that all internal components are dry, then reinstall the top panel.

10.Reconnect brewer to electrical supply.

11.Install the brew chamber without filter paper or grounds. Run at least three full brew cycles and discard all water generated.

12.Brewer is ready to use.

NOTE: Normally, silicone hoses do not need to be delimed. Should deliming hoses become necessary, Bloomfield recommends replacing the hoses.

15

Image 17
Contents Model Shipping Damage Claims Procedure Warranty StatementModel Style Volts Watts Amps Power Supply Cord Table of ContentsSpecifications Features and Operating Controls Electrical Damage Precautions and General InformationBurn Hazard Agency Approval InformationELECTRICIAN’S Installation Instructions Installation InstructionsEquipment Hazard Leveling the UnitPersonal Injury START-UPOperation HOT Water Faucet Automatic OperationPreparation Brewing CoffeeElectric Shock Hazard Cleaning InstructionsElectric Shock Procedure Clean and Sanitize Basin PanSymptom Possible Cause Suggested Remedy Troubleshooting SuggestionsServicing Instructions Access PanelsTemperature Adjustment Replace Thermostat Timer AdjustmentRemove Tank LID Assembly Replace Brew Ready Light or Brew Switch Replace Timer AssemblyReplace Heating Element Replace SolenoidProcedure Delime the Water Tank Servicing Instructions Plumbing Components Exploded View & Parts ListExploded View & Parts List PART# Description QTY Wiring Diagram Telephone Fax