Bloomfield 9220 9221 owner manual Installation Instructions, Initial SET-UP Instructions

Page 8

INSTALLATION INSTRUCTIONS (continued)

IMPORTANT:

Initial set-up must be performed by a qualified installer or qualified service technician. Improper set-up will damage the brewer and void the warranty.

IMPORTANT:

Complete water line installation before connecting brewer to electrical power.

MAKE SURE THE FRONT PANEL "HEATER ON/OFF" SWITCH IS IN THE OFF POSITION BEFORE CONNECTING BREWER TO ELECTRICAL POWER.

DO NOT turn the HEATER ON/ OFF switch on until the water tank is filled. Heating elements must be completely submerged in water at all times. Damage to the brewer caused by operating the heating elements dry is NOT covered by warranty.

NOTE: Brewer will not operate unless the appropriate WARMER SWITCH is turned ON.

INITIAL SET-UP INSTRUCTIONS

Plumber’s and Electrician’s installation procedures must be completed before proceeding with the set-up.

Be sure all electrical connections are secure, and that all plumbing connections are secure and leak-proof.

1. CHECK BREWER FOR PROPER CONFIGURATION

Make sure spray disk gaskets are in place INSIDE of spray heads.

Make sure spray disks are properly installed.

Check hot water faucet for proper operation and leaks. Place empty satellites in position.

2.START BREWER OPERATION

Be sure HEATER ON/OFF switch is OFF, then press POWER SWITCH on back of unit to energize brewer.

Water Inlet Solenoid will energize, filling the tank with water. Fill time is approximately 13 minutes. Tank will fill until water is sensed at the water level probe. Water level will be maintained automatically once the tank is filled.

Press HEATER ON/OFF switch ON. Water in tank will heat to brewing temperature in approximately 30 minutes. When the water temperature reaches the brew temperature set point, the READY-TO-BREW light will glow.

3.FINAL CHECKS

After initial heat-up and before brewing, draw water from the hot water faucet until the inlet solenoid actuates. This will prevent volume differences to the initial brew caused by water expansion.

Press SATELLITE WARMER switch on. Brewer will not operate unless the appropriate SATELLITE WARMER switch on.

6

Image 8
Contents For WithWarranty Statement Table of Contents SpecificationsFeatures and Operating Controls Features and Operating Controls BrewerBrew Chamber SatelliteAgency Approval Information General Information and PrecautionsBurn Hazard Installation Instructions Install LegsPLUMBER’S Installation Instructions ELECTRICIAN’S Installation InstructionsInstallation Instructions Initial SET-UP InstructionsSTART-UP Operating InstructionsGetting Started Operating Instructions Brewing CoffeeHOT Water Faucet Water Flow InletBrew and Bypass Procedure Clean Coffee Brewer ToolsProcedure Clean Satellite Cleaning InstructionsProcedure Delime the Water Tank Servicing InstructionsServicing Instructions Timer Adjustment Temperature Adjustment Troubleshooting Suggestions Description of Problem Possible Cause Suggested RemedySatellite Exploded View & Parts List Satellite ModelExploded View Parts List Cabinet and Exterior Components Description QTYInterior Components Parts List Interior Components Elbow Sprayer Washer Flat #8 SS Tank AssyWiring Diagram Page Telephone Fax

9220 9221 specifications

The Bloomfield 9220 and 9221 are two advanced models in the realm of commercial coffee brewing equipment, specifically designed to cater to the demands of cafes, restaurants, and other high-volume establishments. These brewers stand out due to their user-friendly features, consistent brewing capabilities, and innovative technologies that enhance the coffee-making experience.

One of the defining characteristics of the Bloomfield 9220 and 9221 is their digital control system, which simplifies operation. The intuitive interface allows users to easily adjust brew parameters, ensuring that the coffee is brewed to perfection every time. With programmable options, operators can set brew times, temperatures, and even pre-infusion cycles, which gives them the flexibility to accommodate various coffee bean types and customer preferences.

Both models are equipped with advanced temperature control systems, ensuring that water is heated to the ideal brewing temperature. This feature is crucial for extracting the best flavors from the coffee grounds, allowing for a rich and aromatic cup of coffee. The brew baskets are designed for optimal water flow, which ensures even saturation of the coffee grounds, further enhancing extraction quality.

In terms of capacity, the Bloomfield 9220 and 9221 can brew multiple pots simultaneously, making them particularly suited for busy environments. The models typically feature dual warmers, allowing brewed coffee to be served immediately while maintaining optimal temperatures. This aspect is crucial in a commercial setting where quick service is paramount.

The construction of the Bloomfield brewers reflects durability and ease of maintenance. Made with high-quality stainless steel, these machines not only look sleek but are also built to withstand the rigors of a bustling kitchen. Routine cleaning is straightforward, which helps ensure that the equipment remains in top condition and contributes to the overall flavor profile of the coffee.

Energy efficiency is another highlight of the Bloomfield 9220 and 9221. These models are designed to minimize energy consumption without compromising brewing quality. This is a significant consideration for establishments looking to reduce their overhead costs while still delivering exceptional coffee to their customers.

In summary, the Bloomfield 9220 and 9221 are prime choices for anyone in the commercial coffee marketplace. With their advanced brewing technology, user-friendly digital controls, durable construction, and energy efficiency, these brewers offer a robust solution for high-volume coffee production, ensuring satisfaction for both operators and coffee enthusiasts alike.