Bloomfield 8752 owner manual Brewing Coffee, Preparation, POUR-OVER Operation

Page 10

BREWING COFFEE

CAUTION:

BURN HAZARD

Exposed surfaces of the brewer, brew chamber and decanter may be HOT to the touch, and can cause serious burns.

CAUTION:

BURN HAZARD

To avoid splashing or overflowing hot liquids, ALWAYS place an empty decanter under the brew chamber before starting the brew cycle. Failure to comply can cause serious burns.

CAUTION:

BURN HAZARD

After a brew cycle, brew chamber contents are HOT. Remove the brew chamber and dispose of used grounds with care. Failure to comply can cause serious burns.

NOTE: Water for the hot water faucet is heated in a coil inside of the water tank. Use of the faucet will not affect the volume of water delivered for a brew. However, overuse of the faucet during a brew may lower the temperature of the brew water.

A. PREPARATION

 

Place one (1) genuine Bloomfield

 

paper filter in the brew chamber.

 

Add a pre-measured amount of

 

fresh coffee grounds.

 

Gently shake the brew chamber to

 

level the bed of grounds. Slide the

 

brew chamber into place under the

 

brew head.

Fig. 7 Brew Chamber

B.POUR-OVER OPERATION

NOTE: Any Integrity™ brewer can be used in the pour-over mode. BE sure “READY TO BREW” light is lit.

Place the appropriate EMPTY decanter in place under the brew chamber.

Fill a decanter with tap water. Lift the pour-over cover and pour the entire contents of the decanter into the pour-over opening, which will fill the basin.

Water from the basin will displace a like amount of heated water from the tank. The hot water will be forced into the brew head where it will spray over the bed of grounds. Freshly brewed coffee will begin to fill the container under the brew chamber. When the flow and all dripping stops, the coffee is ready to serve.

Discard the contents of the brew chamber. Rinse the brew chamber in a sink. When the ”HEAT” light goes out, the brewer is ready for another brew cycle.

C.AUTOMATIC OPERATION

BE sure “READY TO BREW” light is lit.

Place the appropriate EMPTY decanter in place under the brew chamber.

Press the “BREW” switch. The solenoid will open for an amount of time determined by the timer setting, admitting a measured quantity of water into the tank.

Inlet water will displace a like amount of heated water from the tank. The hot water will be forced into the brew head where it will spray over the bed of grounds. Freshly brewed coffee will begin to fill the container under the brew chamber.

When the flow and all dripping stops, the coffee is ready to serve.

Discard the contents of the brew chamber and rinse it in a sink. When the ”READY TO BREW” light glows, the brewer is ready for another brew cycle.

8

605 70988 Owners Manual Integrity 5W Decanter Brewer

Image 10
Contents 605 Warranty Statement Specifications Table of ContentsApplicability Features and Operating Controls Electrical Damage Precautions and General InformationAgency Listing Information Burn HazardUnstable Equipment Hazard InstallationPLUMBER’S Installation Instructions Leveling the UnitELECTRICIAN’S Installation Instructions Shock HazardOperation START-UPAutomatic Operation POUR-OVER FeatureHOT Water Faucet Preparation Brewing CoffeePOUR-OVER Operation Procedure Clean Coffee Brewer Cleaning InstructionsTroubleshooting Suggestions Symptom Possible Cause Suggested RemedyAccess Panels Servicing InstructionsTemperature Adjustment Servicing InstructionsReplace Thermostat Timer AdjustmentRemove Tank LID Assembly Replace Heating ElementClean Solenoid Screen Replace SolenoidReplace HOT Water Faucet Coil Replace Timer AssemblyRepair HOT Water Faucet Procedure Delime the Water Tank Chemical Burn HazardServicing Instructions Exploded View & Parts List Cabinet AssemblyExploded View & Parts List Electrical ComponentsHOT Water Tank Assembly Plumbing Components Service Kits Faucet Repair KitsWiring Diagram Telephone Fax