SPECIFICATIONS
ELECTRICAL SPECIFICATIONS
MODEL NO. |
|
|
|
|
|
|
|
Volts | 120 | 120 | 120 |
Watts | 1,800 | 1,800 | 1,800 |
|
|
|
|
Amps | 15 | 15 | 15 |
Wall Outlet (Receptacle) | |||
|
|
|
|
All Brew Centers are single phase with 2 wires plus a ground with cord and plug, except Eport 220V, 1 PH, 50 cycles (UROPEAN).
MECHANICAL SPECIFICATIONS
MODEL NO. | |||
|
|
|
|
Tank Capacity (US gal.) |
|
|
|
|
|
|
|
Cups/Brew Cycle | 12 | 12 | 12 |
|
|
|
|
Cups/Hour | 120 | 120 | 120 |
|
|
|
|
|
|
|
|
Height (includes 2 ½" legs) | 31 | 31 | 31 |
Width | 8 | 16 | 16 |
Depth (+2”for ¼"water connection) | 17 ¼ | 17 ¼ | 17 ¼ |
|
|
|
|
Ship Weight lbs. | 40 | 50 | 50 |
|
|
|
|
START-UP PROCEDURE
1.PLUG THE POWER CORD INTO A PROPER RECEPTACLE.
2.ACTIVATE THE POWER SWITCH ON (Toggle Up), located in the lower left corner in back of Brewer.
3.PUSH THE POWER BUTTON (RED) ON THE TOUCHPAD ON THE FRONT PANEL.
The power switch controls all power including the Heater Elements in the tank and the Warmers. The Brewer will automatically start filling the tank, then it will start to heat up the water in the tank, until it reaches the proper preset temperature (200°F) (About 20 minutes). The LCD window will display a series of messages:
CECILWARE shows day
NG39A shows time
FILLING shows day TANK shows time
HEATING | shows day |
shows temp | shows time |
READY shows day TO BREW shows time
4.PLACE PAPER FILTER AND COFFEE IN THE FUNNEL, AND INSERT FUNNEL IN THE BREWER.
5.PUSH THE BREW BUTTON. YOU NEED NOT WAIT FOR THESE MESSAGES TO COME UP FIRST. After the brew button is pressed, when the “READY TO BREW” message comes on, the Brewer automatically begins brewing coffee. The LEDs will light up and stay on during the brewing cycle.
NOTE: THE BREWER CAN BE PROGRAMMED TO START ITSELF UP AT ANY DESIRED TIME AND SHUT ITSELF OFF AT ANY DESIRED TIME, PROVIDED THAT THE MAIN POWER SWITCH IN THE BACK OF THE BREWER IS KEEPT ON (Toggle Up).
RECOMMENDED COFFEE AMOUNT FOR BREWING
2.5 oz. for one (1) decanter, ½ US gal. (12 cups)
2