BASE AND TOE PANEL
SHU 6800 Series Base and Toe Panel Installation Steps
Installation Parts | SHU6800 BASE PARTS | |
• SHU 6800 Base Part | SHU6800 Base Part | |
• Base Part Screws |
| |
• SHU 6800 Toe Panel | Base Part | |
• SHU Toe Panel Screws | Screws (1lft &1rgt) | |
(attached) | ||
• SHU 6800 Installation Kit | ||
| ||
(Refer to “Materials Supplied” section) | Toe Panel | |
| ||
| Junction Box Cover and Screw | |
Remember to carefully check, the “Materials | Figure 24 | |
Supplied” section against the SHU6800 |
| |
Installation Kit bag and contents. |
|
Disassembly Steps
• Pull Toe Panel off (Figure 25).
• Remove Base Part by pulling it out and downward.
After installation, water and electrical lines are connected and the unit leveled, assemble the base part (see below).
Figure 25
Assembly Steps |
|
• Place |
|
and tighten screw (Figure 26). |
|
• Drop screws inside holes in base part. |
|
• Slip Base Part under and up front |
|
bottom panel of dishwasher. Tighten |
|
Base Part Screws - LOW TORQUE, |
|
USE HAND TOOL ONLY. |
|
• Slip Cotton Insulation Strip under |
|
unit, between the bottom of Base |
|
Part and the floor. | Figure 26 |
Junction Box Cover is required for any installation application
www.boschappliances.com ENGLISH - 15