IMPINGER II AND ADVANTAGE STACKING INSTRUCTIONS
FOR SINGLE OVEN | FOR DOUBLE OVEN (Step 1) |
CAUTION:
DO NOT USE
STANDOFFS AS A
LIFTING MEANS
CAUTION: USE EXTREME CARE SO OVEN DOES NOT SLIP OFF STAND BEFORE SCREWS HAVE SECURED OVEN.
BOTTOM UNIT
1.Remove 4 screws holding top in place and save (2 in front, 2 in rear).
FOR DOUBLE OVEN (Step 2) | FOR DOUBLE OVEN (Step 3) |
|
|
TOP UNIT
1.Remove door, conveyor and finger assemblies.
2.Turn unit on left side, as shown.
3.Drill holes in cover, as shown. Refer to step 3, pg. 14.
4.Assemble top of bottom unit to bottom of top unit with 4 bolts, as shown.
STACKING UNITS
1.Position top unit over top of bottom unit and align top flanges with bottom unit.
2.Replace 4 screws, as shown (2 in front, 2 in rear).
3.Replace door, conveyor and finger assemblies.
4.Stacking is complete.
Impinger II – Digital Advantage Ops Manual | 13 |