IMPINGER II AND ADVANTAGE STACKING INSTRUCTIONS (CONT’D)
FOR TRIPLE OVEN
(STEP 1) | (STEP 2) |
1.Remove door, conveyor and finger assemblies.
2.Turn unit on side, as shown.
3.Fasten base to oven with four ½ - 13 x ½” long Hex Head Bolts.
4.Screw casters into base.
(STEP 3)
1.Prepare top for mounting as shown above.
(STEP 4)
OVEN TO BE STACKED
1.Remove door, conveyor and finger assemblies.
2.Turn unit on left side, as shown.
3.Assemble top of bottom unit to bottom of top unit with 4 bolts, as shown.
1.Set oven upright.
2.Remove oven top by removeing 2 screws in front and 2 screws in back.
(Save the screws.)
3.Replace door, conveyor and fingers.
(STEP 5)
1.Position top oven over bottom and align the top oven flanges over the outside of the bottom oven, as shown.
2.Lower oven in place.
3.Fasten ovens together using the four screws from Step 2
4.Replace door, conveyor and fingers.
5.Repeat steps 2
14 | Impinger II – Digital Advantage Ops Manual |