Bunn VP17B service manual Electrical Requirements, Initial SET-UP

Page 4

ELECTRICAL REQUIREMENTS

CAUTION - The brewer must be disconnected from the power source until specified in Initial Set-Up.

The brewer has an attached cordset and requires 2-wire grounded service rated 120 volts ac, 15 amp, single phase, 60 Hz.

WHITE

NEUTRAL

L1 BLACK

"B" models require 2-wire, grounded service rated 100 volts 100V.A.C. ac, 20 amp, single phase, 50 Hz.

Proceed as follows:

P2185

Electrical Hook-Up (Model "B" Only)

CAUTION – Improper electrical installation will damage electronic components.

1.An electrician must provide electrical service as specified.

2.Using a voltmeter, check the voltage and color coding of each conductor at the electrical source.

3.Place the heater switch, located on the left front of the control panel on "B" Models, in the "OFF" (lower) position.

4.Remove the front panel beneath the sprayhead.

5.Feed the cord through the strain relief and connect it to the terminal block.

6.Connect the brewer to the power source and verify the voltage at the terminal block before proceeding. Replace the front panel.

INITIAL SET-UP

CAUTION - The brewer must be disconnected from the power source throughout the initial set-up, except when specified in the instructions.

1.Insert an empty funnel into the funnel rails.

2.Place an empty decanter under the funnel.

3.On "B" Models, place the heater switch of the brewer in the "OFF" (lower) position and connect the brewer to the power source.

4.Pour three pitchers of tap water into the screened area on top of the brewer. Allow approximately two minutes between pitchers for water to flow into the tank. While the third pitcher of water is entering the tank, the tank will fill to capacity and the excess will flow from the sprayhead, out of the funnel, and into the dispenser.

5.When the flow of water from the funnel stops, place the heater switch of the brewer in the "ON" (upper) position and wait approximately twenty minutes for the water in the tank to heat to the proper temperature. Some water will drip from the funnel during this time; this is due to expansion and should not occur thereafter.

6.Pour one pitcher of tap water into the screened area on top of the brewer.

7.After water has stopped flowing from the funnel, allow the water in the tank to reheat to the proper temperature.

8.Empty the decanter. The brewer is now ready for use in accordance with the coffee brewing instructions.

Page 4

10860

061501

 

 

Image 4
Contents BUNNVP17 Post Office BOX SPRINGFIELD, IllinoisIntroduction WarrantyUser Notices User Notices Electrical Requirements Initial SET-UPCleaning Coffee BrewingTroubleshooting ProblemProbable Cause RemedyTroubleshooting Water Temperature Probable Cause RemedyService Component AccessControl Thermostat Control ThermostatLimit Thermostat Limit ThermostatON/OFF Warmer Switch Connect wire to Terminal #1 as followsTank Heater Tank HeaterService Tank Heater Switch VP17B and early model VP17 Service Tank Heater Switch Warmer Elements Warmer Element TerminalsSchematic Wiring Diagram Volts AC 2 Wire Single PhaseSchematic Wiring Diagram VP17B-1/-2/-3
Related manuals
Manual 16 pages 365 b