Bunn CDBC, CEZF service manual Service Brew Switch Start Model CEZ-APS/TS/TSR, Brew Switch Wiring

Page 26

SERVICE (cont.)

BREW SWITCH (Start) - Model CEZ-APS/TS/TSR

 

 

 

 

 

.

 

 

 

 

-

U

MODEL

 

 

A.C.

THE

 

 

VOLTS MOREOF

 

BE PENDING

 

 

PHASEOR

 

 

UNDER

ONE

 

MAY

 

COVERED

 

 

PATENTS

 

 

 

OTHER

 

 

 

OR MORE

 

 

 

ONE

 

 

 

 

 

 

 

 

 

SOURCEOR

 

 

!

WARNING

 

 

 

POWERPANEL

 

 

 

 

 

 

 

 

ANY

 

 

 

FROMOF

COMPONENT!

 

 

REMOVALOF ANY

 

DISCONNECT

 

 

BEFORE

 

 

 

 

REPLACEMENT

 

P1917

 

 

 

 

 

 

FIG. 7 BREW SWITCH

Location:

The BREW switch is located in the center front of the hood.

Test Procedure:

1.Disconnect the brewer from the power source.

2.Disconnect the white/yellow wire from the top switch terminal and the white/orange from the bottom switch terminal.

3.Check for continuity across the two terminals on the switch when it is held in the lower position. Continuity must not be present across these ter- minals when the switch is released.

If continuity is present as described, reconnect the white/yellow wire to the top terminal and the white/ orange to the bottom terminal.

If continuity is not present as described, replace the switch.

Removal and Replacement:

1.Remove the white/yellow wire and white/orange from the BREW switch.

2.Compress the clips inside the hood and gently push the switch through the opening.

3.Push new switch into the opening and spread the clips to hold the BREW switch in the hood.

4.Refer to FIG. 8 when reconnecting the wires.

WHI/YEL from

Control Board J5-1

WHI/ORA from

Control Board J5-6

P1851

FIG. 8 BREW SWITCH WIRING

Page 26

29253 091603

 

Image 26
Contents Post Office BOX SPRINGFIELD, Illinois Phone 217 FAX 217Contents IntroductionUser Notices Electrical Hook-Up Electrical RequirementsPlumbing Requirements Ready Indicator ON/OFF SwitchBrew Switch Operating ControlsCoffee Brewing CleaningInitial SET-UP CEZ-APS/TS/TSR Adjustments & Optional Settings Adjusting Brew VolumesDisplaying Brew Temperature CDBC-APS/TC/TS/TSR Adjustments & Optional SettingsSetting Brew Temperature Setting Brew LockoutWater Sensing Threshold Adjustment Procedure CDBC-APS/TC/TS/TSR Adjustments & Optional SettingsTroubleshooting Before troubleshooting this brewer, check for the followingProbable Cause TroubleshootingRefill Circuit Problem RemedyTroubleshooting Refill Circuit 2a. Water Level Probe Sensing System CDBC-APS/TS/TSRWater not touching temperature probe Heating Circuit Problem Probable Cause RemedyWater does not heat to proper temperature Troubleshooting Heating Circuit Problem Probable Cause RemedyReplace the control board.See ContControl Board Cdbc & CEZ Pages 21Brewing Circuit Problem Probable Cause Troubleshooting Brewing Circuit Dripping from sprayhead Lime build up Water temperatureSet-upinstructions RequiredFunnel loading Problem Probable CauseDry coffee grounds remain Sprayhead Funnel Diagnostics Cause Things to CheckContents ServiceComponent Access Service Control BoardService Control Board Model CEZ-APS/TS/TSR Control BoardService Switch Panel Model CDBC-APS/TC/TS/TSR Switch PanelON/OFF Switch Wiring Service Brew Switch Start Model CEZ-APS/TS/TSR Brew Switch WiringDispense Valve Dispense ValveLimit Thermostat Limit ThermostatTank Heater Tank HeaterService Tank Heater Tank Heater WiringRefill Valve Check for continuity across the refill valve coil terminals120V AC 2 Wire 120/208V AC 3 Wire 120/240V AC 3 Wire Levelsingle PhaseSchematic Wiring Diagram CEZ-APS/TS/TSR 120V AC 2 Wire Cdbc 15, 20 & 35 APS/TC/TS

CEZF, CDBC specifications

The Bunn CEZF and CDBC are two popular commercial coffee brewers offered by Bunn, a leader in the coffee equipment industry. Both models are designed to meet the demands of high-traffic settings such as cafes, restaurants, and other foodservice establishments. They combine advanced technology with user-friendly features to ensure consistent, high-quality coffee with minimal effort.

The Bunn CEZF model is known for its easy-to-use design and efficiency. One of its standout features is the "Digital Brewer" control, which allows operators to adjust brewing parameters such as brew time and water temperature. This level of customization enables baristas to consistently create the perfect cup of coffee tailored to their specific blends. Furthermore, the CEZF has a unique "intelligent" warming plate that maintains the optimal serving temperature without over-extraction, ensuring that each cup of coffee remains flavorful.

On the other hand, the Bunn CDBC incorporates a dual brewing capacity that allows for larger batches of coffee to be made simultaneously. This feature is particularly beneficial in high-demand environments where quick service is essential. The CDBC also utilizes a patented brew control technology, enabling users to select their brew strength with just a few button presses. This flexibility is complemented by its high-performance heating element, which heats water rapidly, ensuring that coffee is brewed at the ideal temperature for optimal extraction.

Both models are equipped with a large water reservoir, ensuring a continuous supply of hot water for brewing. They also feature high-quality stainless steel constructions that enhance durability and make cleaning easier. The intuitive interface on both models simplifies operation, with clear instructions that allow even novice users to brew exceptional coffee right away.

In terms of safety, both the CEZF and CDBC are designed with auto shut-off features and integrated safety protocols, minimizing the risk of overheating and ensuring a secure brewing environment.

Overall, the Bunn CEZF and CDBC are excellent choices for any commercial kitchen or café looking to serve high-quality coffee efficiently. Their advanced features, durability, and ease of use make them top contenders in the commercial brewing category.