Bard QC501 installation instructions Contents

Page 2

CONTENTS

Getting Other Information and Publications

 

For more information, contact these publishers:

1

QC General Information

 

QC Model Nomenclature

2

Shipping Damage

5

Unit Removal From Skid

5

Handling Unit After Removal From Skid

5

Removal of Wall Bracket from Shipping Location ...

6

General

6

Minimum Installation Height

6

Duct Work

9

Filters

9

Condensate Drain

10

Mist Eleminator Service

11

Figures

 

 

Figure 1

Unit Dimensions

4

Figure 2

Removal of Unit From Skid

5

Figure 3

Proper Handling of Unit After Removal

 

 

from Skid

6

Figure 4

Installation of Unit w/Wall Sleeve

7

Figure 5

Installation With Free Blow Plenum

8

Figure 6

Ducted Application

8

Figure 7

Supply Duct Connections

9

Figure 8

Filter Location

9

Figure 9A

Side Drain (Side View)

10

Figure 9B

Optional Rear Drain

10

Figure 9C

Rear Drain (Top View)

10

Figure 10

Fresh Air Damper Removal

12

Figure 11

Removal of QTEC ERV

13

Figure 12

Remove Locking Screws from Wheels 14

Figure 13

Unit Mounting Without Wall Sleeve

15

Figure 14

Component Location

16

Figure 15

Low Voltage Wire Harness Plug

18

Figure 16

Remote Thermostat Wiring "X" Option

19

Figure 17

Remote Thermostat Wiring "D" Option

20

Figure 18

Internal 2-Way Valve Piping

24

Figure 19

Internal 3-Way Valve Piping

25

Installation Instructions

 

Mounting the Unit

14

Wiring – Main Power

17

Wiring – Low Voltage Wiring

17

General Information

17

Fluid Connections

17

Low Voltage Connections

18

Start Up

 

Optional CFM

21

Important Installer Note

21

Service Hints

21

Sequence of Operation

21

Troubleshooting ECM Blower Motors

22-23

Tables

 

 

Table 1

Factory Built-In Electric Heat

2

Table 2

Electrical Specifications

2

Table 2A

Cooling Performance Chart

3

Table 3

Operating Voltage Range

17

Table 4

Wall Thermostats and Subbase

 

 

Combinations

17

Table 5

Indoor Blower Performance

21

i

Image 2
Contents QC Series Installation Chilled Water Unit Instructions Model QC501Contents Getting Other Information and Publications For More INFORMATION, Contact These PublishersQC Model Nomenclature Electrical SpecificationsQC Series Water Source General Information Factory BUILT-IN Electric Heat TableCooling Performance Chart PsigUnit Dimensions Handling Unit After Removal from Skid Shipping DamageUnit Removal from Skid General Minimum Installation HeightRemoval of Wall Bracket from Shipping Location Proper Handling of Unit After Removal from SkidInstallation of Unit Thru Wall with Wall Sleeve Installation with Free Blow Plenum Ducted ApplicationSupply Duct Connections Duct WorkFilters Filter LocationRear Drain TOP View Condensate DrainSide Drain Side View Optional Rear DrainBarometric Fresh AIR Damper Optional Commercial Room Ventilator OptionFresh AIR Damper Removal Qtec Energy Recovery Ventilator Option Removal of the Qtec Energy Recovery VentilatorRemoving Locking Screws from Wheels Installation InstructionsMounting the Unit Side Trim Pieces Wall Mounting Bracket Wiring Main Power Component LocationOperating Voltage Range Wiring LOW Voltage WiringFluid Connections Wall Thermostats and Subbase CombinationsLOW Voltage Connections for DDC Control Blower Motor LOW Voltage Wire Harness PlugLOW Voltage Connections Remote Thermostat Wiring Diagram Option Remote Thermostat Wiring Diagram Thermostat Option Start UP Important Installer NoteService Hints Optional CFMTroubleshooting ECM Blower Motors SymptomSymptom Valve Detail Internal 2-WAY Valve PipingInternal 3-WAY Valve Piping

QC501 specifications

The Bard QC501 is an innovative piece of equipment designed specifically for quality control in various manufacturing processes. Known for its precision and efficiency, the QC501 serves multiple industrial sectors, including pharmaceuticals, food and beverage, cosmetics, and chemical manufacturing.

One of the standout features of the Bard QC501 is its state-of-the-art measurement technology. It utilizes advanced sensors and automated systems to ensure highly accurate readings. This precision is critical for industries where even the smallest deviation can result in significant issues, such as compromised product safety or regulatory violations.

The QC501 incorporates a user-friendly interface that simplifies operation for technicians and quality control personnel. Its touchscreen display provides real-time data, allowing users to monitor processes effectively and make on-the-fly adjustments as needed. This responsiveness ensures that production standards are consistently met, enhancing overall efficiency.

Another notable characteristic of the Bard QC501 is its data logging capabilities. The device is equipped with comprehensive software that records, analyzes, and generates reports on quality metrics. This feature is invaluable for facilitating thorough audits and maintaining compliance with stringent industry regulations. By providing a digital trail of quality data, the QC501 empowers companies to demonstrate their commitment to quality assurance.

In terms of connectivity, the QC501 is designed to integrate seamlessly into existing production lines. It offers multiple connectivity options, such as Ethernet and USB ports, making it compatible with various systems. This flexibility allows businesses to enhance their existing quality control processes without a complete overhaul of their infrastructure.

Durability is another critical aspect of the QC501. Manufactured with robust materials, it is designed to withstand the rigors of industrial environments. This reliability reduces downtime due to equipment failure, ensuring that production schedules remain on track.

In summary, the Bard QC501 stands out for its precision measurement technology, user-friendly interface, comprehensive data logging, seamless connectivity, and rugged durability. This combination of features makes it an essential tool for industries striving to maintain high quality standards while optimizing production efficiency. Investing in the Bard QC501 is a proactive step toward enhancing overall product quality and ensuring compliance with regulatory standards.