Bard QC501 Start UP, Optional CFM, Important Installer Note, Service Hints, Sequence of Operation

Page 23

START UP

OPTIONAL CFM

These units are shipped from the factory set to operate at the optional CFM level shown in Table 4. This provides lower operating sound levels for non-ducted, free discharge applications. This CFM level will reduce the system capacity performance by approximately 2% at the same energy efficiency.

Rated CFM is required for ducted applications for maximum performance rating. To obtain full CFM on these models, connect jumper wire as follows:

1.Disconnect all power to the unit. Failure to do so may result in damage to the motor.

2.Open hinged return air grille panel

3.Open control panel cover.

4.Add pink jumper wire (provided) to terminal 5 and 6 on the terminal board.

5.Reverse steps to reassemble.

IMPORTANT INSTALLER NOTE

For improved start up performance, wash the indoor coil with dishwashing detergent.

SERVICE HINTS

1.Caution user to maintain clean air filters at all times. Also, not to needlessly close off supply air registers. This may reduce air flow through the system which shortens equipment service life as well as increasing operating costs and noise levels.

2.The wall thermostat perform multiple functions. Be sure that all function switches are correctly set for the desired operating mode before trying to diagnose any reported service problems.

SEQUENCE OF OPERATION

FIRST STAGE COOLING – Circuit R-Y makes the thermostat open the first stage cooling water valve.

SECOND STAGE COOLING – Circuit R-Y2 make the thermostat open the second stage cooling water valve. The G (indoor motor) circuit is automatically completed on any call for cooling operation, or can be energized by manual fan switch on subbase for constant air circulation.

Caution: Second stage cooling must always be energized in conjunction with first stage. If the second state were energized alone, the condensate from the upper part of the coil could be blow off or re-evaporated as it passes down over the dry portion of the coil.

HEATING – A thermostat demand for heating makes R-W1 circuit as well as R-G circuit. This starts the indoor blower as well as turns on the electric heater.

SECOND STAGE HEATING (15 KW only) – Circuit R-W2 energizes the second contactor and brings on the last 5 KW of heat.

TABLE 5

INDOOR BLOWER PERFORMANCE

 

RATED

1

2

3

4

CFM @ MAX.

 

 

 

OPTIONAL

CONTINUOUS

MODEL

ESP

MAX. ESP

RATED CFM

CFM

CFM

ESP

QC501

0.0

0.8

1200

1000

1000

1175

 

 

 

 

 

 

 

NOTE: These units are equipped with a variable speed (ECM) indoor motor that automatically adjusts itself to maintain approximately the same rate of indoor air flow in both heating and cooling, dry and wet coil conditions, and at both 230/208 or 460 volts.

jMaximum ESP (inches WC) shown is with 1” thick disposable filter (reduced by .2 for 2” filter).

kRated CFM for ducted applications – required for maximum performance rating. To obtain full CFM locate low

voltage terminal strip in the circuit breaker box.There is a pink jumper wire with both ends attached to terminal marked “G2”. Move one end of the jumper to terminal“Y”.

lOptional CFM – the unit is shipped from the factory set to operate at the optional CFM level shown.

This provides lower operating sound levels for non-ducted, free discharge applications. This reduces system capacity performance by approximately 2% at the same energy efficiency.

mContinuous fan CFM is the total air being circulated during continuous fan mode.

Manual 2100-416

Page 21

Image 23
Contents Model QC501 QC Series Installation Chilled Water Unit InstructionsContents For More INFORMATION, Contact These Publishers Getting Other Information and PublicationsFactory BUILT-IN Electric Heat Table Electrical SpecificationsQC Series Water Source General Information QC Model NomenclaturePsig Cooling Performance ChartUnit Dimensions Handling Unit After Removal from Skid Shipping DamageUnit Removal from Skid Proper Handling of Unit After Removal from Skid Minimum Installation HeightRemoval of Wall Bracket from Shipping Location GeneralInstallation of Unit Thru Wall with Wall Sleeve Ducted Application Installation with Free Blow PlenumFilter Location Duct WorkFilters Supply Duct ConnectionsOptional Rear Drain Condensate DrainSide Drain Side View Rear Drain TOP ViewCommercial Room Ventilator Option Barometric Fresh AIR Damper OptionalFresh AIR Damper Removal Removal of the Qtec Energy Recovery Ventilator Qtec Energy Recovery Ventilator OptionRemoving Locking Screws from Wheels Installation InstructionsMounting the Unit Side Trim Pieces Wall Mounting Bracket Component Location Wiring Main PowerWall Thermostats and Subbase Combinations Wiring LOW Voltage WiringFluid Connections Operating Voltage RangeLOW Voltage Connections for DDC Control Blower Motor LOW Voltage Wire Harness PlugLOW Voltage Connections Remote Thermostat Wiring Diagram Option Remote Thermostat Wiring Diagram Thermostat Option Optional CFM Important Installer NoteService Hints Start UPSymptom Troubleshooting ECM Blower MotorsSymptom Internal 2-WAY Valve Piping Valve DetailInternal 3-WAY Valve Piping

QC501 specifications

The Bard QC501 is an innovative piece of equipment designed specifically for quality control in various manufacturing processes. Known for its precision and efficiency, the QC501 serves multiple industrial sectors, including pharmaceuticals, food and beverage, cosmetics, and chemical manufacturing.

One of the standout features of the Bard QC501 is its state-of-the-art measurement technology. It utilizes advanced sensors and automated systems to ensure highly accurate readings. This precision is critical for industries where even the smallest deviation can result in significant issues, such as compromised product safety or regulatory violations.

The QC501 incorporates a user-friendly interface that simplifies operation for technicians and quality control personnel. Its touchscreen display provides real-time data, allowing users to monitor processes effectively and make on-the-fly adjustments as needed. This responsiveness ensures that production standards are consistently met, enhancing overall efficiency.

Another notable characteristic of the Bard QC501 is its data logging capabilities. The device is equipped with comprehensive software that records, analyzes, and generates reports on quality metrics. This feature is invaluable for facilitating thorough audits and maintaining compliance with stringent industry regulations. By providing a digital trail of quality data, the QC501 empowers companies to demonstrate their commitment to quality assurance.

In terms of connectivity, the QC501 is designed to integrate seamlessly into existing production lines. It offers multiple connectivity options, such as Ethernet and USB ports, making it compatible with various systems. This flexibility allows businesses to enhance their existing quality control processes without a complete overhaul of their infrastructure.

Durability is another critical aspect of the QC501. Manufactured with robust materials, it is designed to withstand the rigors of industrial environments. This reliability reduces downtime due to equipment failure, ensuring that production schedules remain on track.

In summary, the Bard QC501 stands out for its precision measurement technology, user-friendly interface, comprehensive data logging, seamless connectivity, and rugged durability. This combination of features makes it an essential tool for industries striving to maintain high quality standards while optimizing production efficiency. Investing in the Bard QC501 is a proactive step toward enhancing overall product quality and ensuring compliance with regulatory standards.