Initial Start Up

Now that the brewer is connected, it can be started and checked.

Leave the access cover open.

Turn on the water supply.

Turn on the electricity to the urn.

The urn will now begin to fill. The heaters should still be off. When the water level is above the heaters, the contactor will close to turn on the heaters.

Check for leaks in the water connection and inside the control enclosure. Assuming all is working correctly, close the control enclosure and allow to finish filling. An indicator light labeled FILLING is lit while the fill valve is open. When the light turns off, the urn is full. The urn will take approximately 15 minutes to fill.

If cold water is used, the heat-up time is approximately 30 minutes depending on the electric ratings of the urn. An indicator light labeled WATER HOT will turn on when the heaters have shut off.

 

 

Page 9

American Metal Ware 67710E Coffee Urn

Image 9
Contents Model 67710E American Metal Ware 67710E Coffee Urn Introduction Safety and Security Features of This ModelMaintenance About the 67710E Coffee Urn General DescriptionPre-Installation Package Contents American Metal Ware 67710E Coffee Urn Initial Considerations InstallationElectric Hook-Up Service Hookup LocationsInitial Start Up Start the Brew Load the CoffeeAfter the Brew is Finished Bypass Adjustment AdjustmentsThermostat Adjustment To change the water tank temperatureTimer Adjustment To Change the Water Tank TemperatureFlow Rate Adjustment To Adjust the TimerTo adjust the rate Fill Rate AdjustmentTo Adjust the Fill Rate After Each Use CleaningEach Day Semi-WeeklyAmerican Metal Ware 67710E Coffee Urn American Metal Ware 67710E Coffee Urn American Metal Ware 67710E