Vulcan-Hart VB73R, ESB36 operation manual Operation, Controls Figs, Grease PAN Fig

Page 6

OPERATION

WARNING: THE BROILER AND ITS PARTS ARE HOT. BE CAREFUL WHEN OPERATING, CLEANING OR SERVICING THE BROILER.

CONTROLS (Fig's. 1 & 2)

Infinite Load Switches — Two switches independently control the left and right heating elements in 208, 240, 220/380 and 240/415 volt models. Provides a variable range of on time from 22% to 100%.

3-Heat,4-Position Switch — Controls both elements on 480 volt models. Provides approximately 100% of total available power (6 KW) at HI position, 50% at MED position, 25% at LO position, and 0% at OFF position. The left side element is slightly longer than the right side element and has a higher KW rating than the right side (3.150 vs. 2.850 KW).

INFINITE LOAD SWITCH

3-HEAT, 4-POSITION SWITCH

Fig. 1

Fig. 2

GREASE PAN (Fig. 3)

Collects grease and waste. The grease pan is located under the broiler on the left side. DO NOT allow the grease pan to overflow. Empty the grease pan when three-quarters full to reduce the possibility of spillage. Pull the grease pan out very carefully to avoid liquid wave action.

Grease Pan

Fig. 3

PL-40527-1

— 6 —

Image 6
Contents Installation VB73 Salamander Broiler Mounted Over VR2 Range Table of Contents Installation Installation Codes and StandardsUnpacking Assembly LocationElectrical Connections Operation Controls FigsGrease PAN Fig Power Outage Grid AdjustmentCare and Cleaning GridService and Parts Information MaintenanceTroubleshooting Problem Possible CauseEntretien Rechange DE Cesèpi ET ENTRETIEN’L DE ServicePannageéd Possibles Causes MeèproblChargementéd ET Chargement Courant DE PanneNettoyage Grille LA DE PositionnementFonctionnement VB73R et VB73 grilloirs-Salamandres ESB36 et VB73R VB73, grilloirs-SalamandresESB36 grilloir-Salamandre Lectriqueé RaccordementNormes ET INSTALLATION’D Codes BallageédResèmati DES Table VR2 Reècuisini UNE SUR Eéinstall VB73 GRILLOIR-SALAMANDRE Demploi Mode