Vulcan-Hart C24GA10, C24GA6, ML-136022, ML-136021 Electrical Connection, Electrical Data, Start UP

Page 11

ELECTRICAL CONNECTION

WARNING: THE STEAMER IS EQUIPPED WITH A THREE-PRONG GROUNDING PLUG. THE OUTLET TO WHICH THIS PLUG IS CONNECTED MUST BE PROPERLY GROUNDED. IF THE RECEPTACLE IS NOT THE PROPER GROUNDING TYPE, CONTACT AN ELECTRI- CIAN. DO NOT REMOVE THE GROUNDING PRONG FROM THE PLUG.

WARNING: ELECTRICAL AND GROUNDING CONNECTIONS MUST COMPLY WITH THE APPLICABLE PORTIONS OF THE NATIONAL ELECTRICAL CODE AND/OR OTHER LOCAL ELECTRICAL CODES.

Refer to the data plate located on the left edge of the tabletop and the electrical diagram located behind the front panel on the base.

ELECTRICAL DATA

Volts

120

Hertz (Hz)

60

Phase

1

Machine Amps

3

Minimum Circuit

15

Ampacity, Maximum

 

Protective Device

 

AMPS

 

C24GA SERIES GAS CONVECTION STEAMERS

START UP

WARNING: THE STEAMER AND ITS PARTS ARE HOT. USE CARE WHEN OPERATING, CLEAN- ING OR SERVICING THE STEAMER. THE COOKING COMPARTMENT CONTAINS LIVE STEAM. STAY CLEAR WHILE OPENING THE DOOR.

Once the steamer is installed and all mechanical connections have been made, thoroughly test the steamer before operation.

1.Check that proper water, drain, electrical and gas connections have been made.

2.Turn on manual gas valve.

3.Press power switch to the on position. After approximately 20 minutes the ready light should come on, indicating that generator has reached operating pressure.

4.With the door closed the ready light comes on. Set the timer to the 5-minute position. Open the door and observe that no steam is entering the compartment and the ready and cooking lights are off.

5.Close the compartment door. The cooking light should now be lit and steam should be heard entering the compartment.

6.Check the drain line to be sure that water from the cold water condenser is flowing through the drain line.

7.Open the compartment door and observe that steam supply to the compartment stops, and that the ready light and cooking light turn off.

8.Close the compartment door and let the cooking cycle finish. When the timer returns to the 0 position, a buzzer will sound, signaling the end of the cooking cycle and the cooking light goes off. To silence the buzzer, turn the dial timer to the OFF position.

9.Complete the above steps for each cooking compartment.

10.To shutdown the steamer, press the power switch to the off position and close the manual gas shutoff valve. Leave the compartment doors slightly open to allow the inside to dry out.

— 11 —

Image 11
Contents Installation C24GA Series GAS Convection Steamers For Your Safety Important for Your SafetyTable of Contents General InstallationInstallation Codes Standards IntroductionLeveling and Anchoring Location GAS SteamersWater Supply Connection Plumbing ConnectionsWater Requirements Water TreatmentDrain Connection GAS Supply ConnectionAir˚Pressure˚ Adjust˚Screw On˚Side˚of˚ Drip˚Cover End Fittings 1 Quick Disconnect End Fittings Both Threaded LengthFlue GAS Exhaust Testing the Gas Supply SystemStart UP Electrical ConnectionElectrical Data Function OperationLighting and Shutdown Instructions Compartment ControlsOperating Startup ProcedurePreheating SteamingCompartments CleaningCooking Compartment Drains Draining GeneratorGuidelines for Maintaining Stainless Steel Surfaces Leave Compartment Doors OpenFlue MaintenanceScale Related Maintenance Water Treatment SystemProducts to be Cooked in Solid Pans Cooking ChartProduct Timer Setting Weight Minutes Products to be Cooked in Perforated Pans Cooking Hints Symptoms Possible Causes Remedy TroubleshootingService and Parts Information