GE PVB67, PVB98, PVB37, PVB94 Installation Instructions, Install Downdraft Vent, Install Ductwork

Page 11

Installation Instructions

1 INSTALL DOWNDRAFT VENT

Place the downdraft vent into the countertop cutout, against the back side.

Bracket location for right-side or straight- down blower discharge

Support

 

 

Support

Bracket

A

B

Bracket

 

 

 

 

 

Top View of

 

 

 

Support Bracket

Locate the brackets and attachment screws.

On some models, the attachment screws may be placed on the control box in position A or B.

Fasten one bracket to each side rail, position A and B, and secure to the cabinet back wall.

Bracket location for left-side blower discharge

B Support

Bracket

C

Support

Bracket

Top View of

Support Bracket

Locate the brackets and attachment screws.

On some models, the attachment screws may be placed on the control box in position A or B.

Use location C on the control box instead

of location A for left discharge orientation of the blower.

• When installing in

A

a tile countertop

 

surface, it may be

C

necessary to apply

 

a locally approved caulking to cover any gaps.

2INSTALL DUCTWORK

The downdraft blower system is designed for use with 3-1/4" x 10" ductwork. It can be transitioned to 6" round.

Ductwork MUST be vented to the outside—never in a crawl space, attic or other enclosed space.

6" PVC duct should be used when installing under a concrete slab.

NOTE: Local building code must be followed for installation in specifying approved type and schedule of PVC duct used.

Duct Tape

Over Seam and Screw

Air

Flow

Screw

DO NOT USE flexible plastic ducting.

Always use appropriate roof or wall cap with damper. Laundry-type wall caps should never be used.

Use the straightest duct run possible.

For satisfactory performance, the duct run should not exceed 150 ft. or its equivalent length when bends or various fittings are used. Refer to the table of equivalent lengths to calculate your installation.

Install ductwork so the piece of duct nearest the downdraft unit slots INTO the next piece of the duct. Secure the joints with self-tapping screws and apply duct tape around the joints to ensure an airtight seal.

11

Image 11
Contents Installation Instructions This appliance must be properly grounded Safety InformationCompletion Time 1 to 3 hours Read these instructions completely and carefullyDesign Information ContentsProduct Dimensions AccessoriesAdvance Planning Electrical and Gas Locations ClearancesDuctwork COOKTOP/DOWNDRAFT Installation PreparationCutouts and Clearances Remove Packaging ClearancesParts Supplied Tools and Materials RequiredPlease read carefully Power SupplyGas Cooktops Electric CooktopsDischarge Direction Side-to-Side AdjustmentsReinstall blower and mounting plate with original screws Venting OptionsFlexible ducting Use 3-1/4 x 10 duct. It can transition to 6 roundBracket location for left-side blower discharge Installation InstructionsInstall Downdraft Vent Install DuctworkDrill a 1/2-dia. hole into the desired location Connect Control Switch to Remote HarnessConnect Wire Lead to Control Box To lower the vent, press the ON/OFF pad Connect PowerCleaning Plug power cord into properly grounded receptaclePage Page 31-10728 10728-31 Notas Notas Energía LA Conecte Instalación de InstruccionesModelos algunos en Control DE Interruptor EL Instale Conductos LOS Instale Para tabla esta Utilice Instalación la para PreparaciónPermitidas máximas Longitudes las calcularDerecha o izquierda la hacia descarga una cambiar Para Ventilación DE OpcionesDescarga de Dirección Laterales AjustesUn cambiar consumidor del obligación y Energía DE SuministroTierra a Espacios 2 Mínimo Marque y mida comenzar, de Antes NotaEspacios Diseño de InformaciónElectricidad y gas de suministro del Ubicación ConductosInstalación la comenzar de Antes Creativas SolucionesBase gabinete de Requisitos Encimera de mostrador del RequisitosConductos Instalación de Instrucciones1845.444.800.1 Seguridad de InformaciónAl llame 3344.561.800.1Instalación de Instrucciones