GE PVB98, PVB37, PVB94 Connect Control Switch to Remote Harness, Connect Wire Lead to Control Box

Page 12

Installation Instructions

3 INSTALL CONTROL SWITCH (on some models)

Skip this step if there is no separate control switch.

WARNING:

Disconnect electrical power from unit before beginning switch installation. Failure to do so could result in personal injury or damage to the electrical controls.

Determine the location for the control switch. The wiring lead is 68" long.

Remote Switch

Foam Piece With Adhesive Mounting Surface

1/2"-Dia.

Hole

Strain Relief (Adhesive wire clamp with tie)

Remote Harness

Connect Control Switch to Remote Harness

Thread the remote harness through the 1/2"-dia. hole and attach the harness connector to the remote connector.

Remove the paper backing on the foam piece and mount the remote trim on the countertop such that the switch connectors stay located in the 1/2"-dia. hole.

Stick adhesive wire clamp near the 1/2"-dia. hole and attach the loose wire with a wire tie.

Mating Connectors

Strain Relief (Adhesive wire clamp with tie)

Control

Box

Remote Harness

Drill a 1/2"-dia. hole into the desired location.

Use the mounting bracket as a template to locate the hole accurately. Check for interference between the switch cover, adjacent objects

and cooktop/vent overlaps.

If switch is mounted into a tile surface, drill the hole between tiles. Use locally approved caulking to cover any gaps.

Connect Wire Lead to Control Box

Connect the mating wire ends.

Place the adhesive wire clamps (provided) near the mating connector.

Keep approximately 3"-long wire and attach the wire to the clamp with a wire tie. This will act as a strain relief.

12

Image 12
Contents Installation Instructions Safety Information Completion Time 1 to 3 hoursRead these instructions completely and carefully This appliance must be properly groundedContents Product DimensionsAccessories Design InformationAdvance Planning Clearances DuctworkElectrical and Gas Locations Installation Preparation Cutouts and ClearancesCOOKTOP/DOWNDRAFT Clearances Parts SuppliedTools and Materials Required Remove PackagingPower Supply Gas CooktopsElectric Cooktops Please read carefullySide-to-Side Adjustments Reinstall blower and mounting plate with original screwsVenting Options Discharge DirectionUse 3-1/4 x 10 duct. It can transition to 6 round Flexible ductingInstallation Instructions Install Downdraft VentInstall Ductwork Bracket location for left-side blower dischargeConnect Control Switch to Remote Harness Connect Wire Lead to Control BoxDrill a 1/2-dia. hole into the desired location Connect Power CleaningPlug power cord into properly grounded receptacle To lower the vent, press the ON/OFF padPage Page 31-10728 10728-31 Notas Notas Instalación de Instrucciones Energía LA ConecteModelos algunos en Control DE Interruptor EL Instale Conductos LOS Instale Instalación la para Preparación Permitidas máximasLongitudes las calcular Para tabla esta UtiliceVentilación DE Opciones Descarga de DirecciónLaterales Ajustes Derecha o izquierda la hacia descarga una cambiar ParaEnergía DE Suministro Tierra aUn cambiar consumidor del obligación y Espacios Marque y mida comenzar, de Antes Nota 2 MínimoDiseño de Información Electricidad y gas de suministro del UbicaciónConductos EspaciosCreativas Soluciones Base gabinete de RequisitosEncimera de mostrador del Requisitos Instalación la comenzar de AntesInstalación de Instrucciones ConductosSeguridad de Información Al llame3344.561.800.1 1845.444.800.1Instalación de Instrucciones