GE PVB67, PVB98, PVB37, PVB94 installation instructions

Page 15

Notes

15

Image 15
Contents Installation Instructions This appliance must be properly grounded Safety InformationCompletion Time 1 to 3 hours Read these instructions completely and carefullyDesign Information ContentsProduct Dimensions AccessoriesAdvance Planning Clearances DuctworkElectrical and Gas Locations Installation Preparation Cutouts and ClearancesCOOKTOP/DOWNDRAFT Remove Packaging ClearancesParts Supplied Tools and Materials RequiredPlease read carefully Power SupplyGas Cooktops Electric CooktopsDischarge Direction Side-to-Side AdjustmentsReinstall blower and mounting plate with original screws Venting OptionsFlexible ducting Use 3-1/4 x 10 duct. It can transition to 6 roundBracket location for left-side blower discharge Installation InstructionsInstall Downdraft Vent Install DuctworkConnect Control Switch to Remote Harness Connect Wire Lead to Control BoxDrill a 1/2-dia. hole into the desired location To lower the vent, press the ON/OFF pad Connect PowerCleaning Plug power cord into properly grounded receptaclePage Page 31-10728 10728-31 Notas Notas Energía LA Conecte Instalación de InstruccionesModelos algunos en Control DE Interruptor EL Instale Conductos LOS Instale Para tabla esta Utilice Instalación la para PreparaciónPermitidas máximas Longitudes las calcularDerecha o izquierda la hacia descarga una cambiar Para Ventilación DE OpcionesDescarga de Dirección Laterales AjustesEnergía DE Suministro Tierra aUn cambiar consumidor del obligación y Espacios 2 Mínimo Marque y mida comenzar, de Antes NotaEspacios Diseño de InformaciónElectricidad y gas de suministro del Ubicación ConductosInstalación la comenzar de Antes Creativas SolucionesBase gabinete de Requisitos Encimera de mostrador del RequisitosConductos Instalación de Instrucciones1845.444.800.1 Seguridad de InformaciónAl llame 3344.561.800.1Instalación de Instrucciones