GE PVB94, PVB98, PVB37, PVB67 Installation Preparation, Cutouts and Clearances, Cooktop/Downdraft

Page 6

Installation Preparation

CUTOUTS AND CLEARANCES

Measure carefully when cutting the countertop.

Make sure sides of the opening are parallel and rear and front cuts are exactly perpendicular to the sides.

Measure to be sure there is room for clearances to the front edge of the countertop.

Refer to cooktop installation instructions to be sure that models fit into the base cabinets being used.

Draw lines on the countertop to follow as

a cutting guide. Measure and mark cooktop and vent overlaps to be sure there is enough flat countertop depth.

30" COOKTOP/DOWNDRAFT

The cooktop must be installed per manufacturer’s installation instructions.

IMPORTANT: The countertop cutout requires 23-1/2" minimum flat countertop surface and 25" minimum total countertop depth.

8-1/2"

2-1/8"*

30"

*Includes 1/8" gap between cooktop and vent trim

NOTE: Before you begin, measure and mark depth to ensure that adequate flat countertop surface is available.

Draw lines on the countertop to follow as a cutting guide.

Make sure sides of the opening are parallel

and rear and front cuts are exactly perpendicular (right angle) to sides.

36" COOKTOP/DOWNDRAFT

IMPORTANT: The countertop cutout requires 23-1/2" minimum flat countertop surface and 25" minimum total countertop depth.

NOTE: Before you begin, measure and mark depth to ensure that adequate flat countertop surface is available.

Draw lines on the countertop to follow as a cutting guide.

Make sure sides of the opening are parallel

and rear and front cuts are exactly perpendicular (right angle) to sides.

3/8" Minimum flat countertop

 

behind cutout required

2-1/2" Minimum**

28-1/2"

 

22-3/8"

 

**Required to maintain UL or CSA approvals

8-1/2"

2-1/8"*

36"

*Includes 1/8" gap between cooktop and vent trim

3/8" Minimum flat countertop

 

behind cutout required

2-1/2" Minimum**

34"

 

21-7/8"

 

**Required to maintain UL or CSA approvals

6

Image 6
Contents Installation Instructions Read these instructions completely and carefully Safety InformationCompletion Time 1 to 3 hours This appliance must be properly groundedAccessories ContentsProduct Dimensions Design InformationAdvance Planning Clearances DuctworkElectrical and Gas Locations Installation Preparation Cutouts and ClearancesCOOKTOP/DOWNDRAFT Tools and Materials Required ClearancesParts Supplied Remove PackagingElectric Cooktops Power SupplyGas Cooktops Please read carefullyVenting Options Side-to-Side AdjustmentsReinstall blower and mounting plate with original screws Discharge DirectionUse 3-1/4 x 10 duct. It can transition to 6 round Flexible ductingInstall Ductwork Installation InstructionsInstall Downdraft Vent Bracket location for left-side blower dischargeConnect Control Switch to Remote Harness Connect Wire Lead to Control BoxDrill a 1/2-dia. hole into the desired location Plug power cord into properly grounded receptacle Connect PowerCleaning To lower the vent, press the ON/OFF padPage Page 31-10728 10728-31 Notas Notas Instalación de Instrucciones Energía LA ConecteModelos algunos en Control DE Interruptor EL Instale Conductos LOS Instale Longitudes las calcular Instalación la para PreparaciónPermitidas máximas Para tabla esta UtiliceLaterales Ajustes Ventilación DE OpcionesDescarga de Dirección Derecha o izquierda la hacia descarga una cambiar ParaEnergía DE Suministro Tierra aUn cambiar consumidor del obligación y Espacios Marque y mida comenzar, de Antes Nota 2 MínimoConductos Diseño de InformaciónElectricidad y gas de suministro del Ubicación EspaciosEncimera de mostrador del Requisitos Creativas SolucionesBase gabinete de Requisitos Instalación la comenzar de AntesInstalación de Instrucciones Conductos3344.561.800.1 Seguridad de InformaciónAl llame 1845.444.800.1Instalación de Instrucciones