GE PVB94, PVB98, PVB37, PVB67 installation instructions Notas

Page 18

15

Notas

Image 18
Contents Installation Instructions Read these instructions completely and carefully Safety InformationCompletion Time 1 to 3 hours This appliance must be properly groundedAccessories ContentsProduct Dimensions Design InformationAdvance Planning Clearances DuctworkElectrical and Gas Locations Installation Preparation Cutouts and ClearancesCOOKTOP/DOWNDRAFT Tools and Materials Required ClearancesParts Supplied Remove PackagingElectric Cooktops Power SupplyGas Cooktops Please read carefullyVenting Options Side-to-Side AdjustmentsReinstall blower and mounting plate with original screws Discharge DirectionUse 3-1/4 x 10 duct. It can transition to 6 round Flexible ductingInstall Ductwork Installation InstructionsInstall Downdraft Vent Bracket location for left-side blower dischargeConnect Control Switch to Remote Harness Connect Wire Lead to Control BoxDrill a 1/2-dia. hole into the desired location Plug power cord into properly grounded receptacle Connect PowerCleaning To lower the vent, press the ON/OFF padPage Page 31-10728 10728-31 Notas Notas Instalación de Instrucciones Energía LA ConecteModelos algunos en Control DE Interruptor EL Instale Conductos LOS Instale Longitudes las calcular Instalación la para PreparaciónPermitidas máximas Para tabla esta UtiliceLaterales Ajustes Ventilación DE OpcionesDescarga de Dirección Derecha o izquierda la hacia descarga una cambiar ParaEnergía DE Suministro Tierra aUn cambiar consumidor del obligación y Espacios Marque y mida comenzar, de Antes Nota 2 MínimoConductos Diseño de InformaciónElectricidad y gas de suministro del Ubicación EspaciosEncimera de mostrador del Requisitos Creativas SolucionesBase gabinete de Requisitos Instalación la comenzar de AntesInstalación de Instrucciones Conductos3344.561.800.1 Seguridad de InformaciónAl llame 1845.444.800.1Instalación de Instrucciones